The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for May 16, 2005

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 0 04/08/2005 REFUELING OUTAGE    
Millstone 3 100        
Nine Mile Point 1 100     *  
Nine Mile Point 2 100        
Oyster Creek 100     *  
Peach Bottom 2 100        
Peach Bottom 3 100     *  
Pilgrim 1 100     *  
Salem 1 100        
Salem 2 99   100% ELECTRICAL CAPABILITY    
Seabrook 1 100        
Susquehanna 1 97   GENERATION ALERT DOWNPOWER REQUEST *  
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 100        
Browns Ferry 3 98   SCHEDULED LOAD DROP *  
Brunswick 1 100     *  
Brunswick 2 100        
Catawba 1 0 05/07/2005 REFUELING OUTAGE - DEFUELED    
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 58   INCREASING POWER *  
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 0 04/24/2005 REFUELING OUTAGE    
Summer 0 04/23/2005 REFUELING OUTAGE    
Surry 1 100        
Surry 2 0 04/23/2005 REFUELING OUTAGE    
Turkey Point 3 100        
Turkey Point 4 0 04/10/2005 REFUELING OUTAGE    
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100     *  
Byron 1 100        
Byron 2 100        
Clinton 95   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 98   100% ELECTRICAL CAPABILITY    
Dresden 3 98   100% ELECTRICAL CAPABILITY    
Duane Arnold 93   100% ELECTRICAL CAPABILITY *  
Fermi 2 100        
Kewaunee 0 02/20/2005 RESOLVING AUXILIARY FEEDWATER ISSUES    
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100     *  
Perry 1 100     *  
Point Beach 1 100     *  
Point Beach 2 0 04/01/2005 REFUELING OUTAGE    
Prairie Island 1 100        
Prairie Island 2 0 04/15/2005 REFUELING OUTAGE - DEFUELED    
Quad Cities 1 85   LIMITED IN POWER (STEAM DRYER MONITORING)    
Quad Cities 2 0 05/09/2005 DRYER REPLACEMENT COMPLETE - STARTUP PREPARATIONS IN PROGRESS *  

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 0 05/06/2005 REFUELING OUTAGE    
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 02/26/2005 REFUELING OUTAGE    
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 0 04/01/2005 HEATUP IN PROGRESS *  
Palo Verde 3 100     *  
River Bend 1 100        
San Onofre 2 99   MAXIMUM OPERATING POWER    
San Onofre 3 100        
South Texas 1 100        
South Texas 2 100        
Waterford 3 0 04/16/2005 CORE RELOAD COMPLETE - STARTUP PREPARATIONS IN PROGRESS *  
Wolf Creek 1 0 04/08/2005 HEATUP IN PROGRESS *  

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021