The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for December 5, 2004

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100     *  
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 0 10/10/2004 DEFUELED    
Indian Point 2 100     *  
Indian Point 3 100        
Limerick 1 100        
Limerick 2 62   ROD PATTERN ADJUSTMENT AND TURBINE VALVE TESTING *  
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 63   FLUX DEPRESSION TESTING FOR FUEL PIN LEAK    
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 0 12/03/2004 PLANNED SHUTDOWN DUE TO OIL TANKER SPILL. SEE EN#41240.    
Salem 2 0 12/03/2004 PLANNED SHUTDOWN DUE TO OIL TANKER SPILL. SEE EN#41240.    
Seabrook 1 100        
Susquehanna 1 100        
Susquehanna 2 86   INCREASING POWER AFTER ROD PATTERN ADJUSTMENT *  
Three Mile Island 1 71   REPAIRING HEATER DRAIN PIPE DUE TO STEAM LEAK *  
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 94   POWER COASTDOWN TO REFUELING OUTAGE *  
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100     *  
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 0 10/08/2004 DEFUELED    
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 69   HOLDING FOR NIS RE-SCALING *  
Surry 2 100        
Turkey Point 3 60   HOLDING FOR REPAIRS ON CONDENSER TUBE LEAKAGE *  
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 83   TURBINE VALVE TESTING *  
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 0 11/02/2004 SHUTDOWN FOR MAIN TURBINE REPAIR AND INSPECTING THE STEAM DRYER    
Dresden 3 0 10/26/2004 RESTART PREPARATIONS IN PROGRESS    
Duane Arnold 94   100% ELECTRICAL CAPABILITY    
Fermi 2 0 12/04/2004 AUTOMATIC REACTOR SCRAM. SEE EVENT # 41243 * 1
Kewaunee 30   HOLDING FOR STEAM GENERATOR CHEMISTRY *  
La Salle 1 75   PERFORMING TURBINE VALVE TESTING, MSIV TESTING AND SCRAM TIME TESTING. *  
La Salle 2 100        
Monticello 100     *  
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 99        
Prairie Island 2 100        
Quad Cities 1 85   LIMITED IN POWER (STEAM DRYER MONITORING)    
Quad Cities 2 85   LIMITED IN POWER (STEAM DRYER MONITORING)    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 93   COASTDOWN TO REFUELING OUTAGE    
Diablo Canyon 1 100        
Diablo Canyon 2 0 10/25/2004 REFUELING OUTAGE    
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 0 10/01/2004 PLANNED MAINTENANCE    
River Bend 1 100        
San Onofre 2 100     *  
San Onofre 3 0 09/27/2004 DEFUELED    
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021