Power Reactor Status Report for September 15, 2003

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 0 09/12/2003 REFUELING OUTAGE    
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 6   ENTERING REFUELING OUTAGE *  
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100     *  
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 0 09/14/2003 DISCRETIONARY UNUSUAL EVENT. SEE EVENT # 40158. * 1
Peach Bottom 3 0 09/14/2003 DISCRETIONARY UNUSUAL EVENT. SEE EVENT # 40158 * 1
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100   COASTDOWN TO REFUELING OUTAGE    
Susquehanna 1 93   INCREASING POWER *  
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 93   100% ELECTRICAL CAPABILITY    
Brunswick 2 96   100% ELECTRICAL CAPABILITY    
Catawba 1 100        
Catawba 2 100        
Crystal River 3 82   CIRC WATER SYSTEM MAINTENANCE    
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 0 09/05/2003 DEFUELED *  
North Anna 1 100        
North Anna 2 100        
Oconee 1 71   COASTDOWN TO REFUELING OUTAGE *  
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 0 09/07/2003 REFUELING OUTAGE    

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 97   COASTDOWN TO REFUELING OUTAGE *  
Byron 2 100        
Clinton 92   100% ELECTRICAL CAPABILITY *  
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 0 02/15/2002 MAINTENANCE OUTAGE    
Dresden 2 97   100% ELECTRICAL CAPABILITY    
Dresden 3 98   100% ELECTRICAL CAPABILITY    
Duane Arnold 94   100% ELECTRICAL CAPABILITY    
Fermi 2 100        
Kewaunee 100        
La Salle 1 88   REDUCED POWER DUE TO TRIP OF 14B FEEDWATER HEATER *  
La Salle 2 15   PREPARATION FOR ROLLING TURBINE *  
Monticello 100        
Palisades 100        
Perry 1 30   INCREASING POWER *  
Point Beach 1 100        
Point Beach 2 87   COASTDOWN TO REFUELING OUTAGE *  
Prairie Island 1 100        
Prairie Island 2 0 09/12/2003 REFUELING OUTAGE    
Quad Cities 1 97   INCREASING POWER *  
Quad Cities 2 100   100% ELECTRICAL CAPABILITY *  

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 71   COASTDOWN TO REFUELING OUTAGE *  
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100     *  
Cooper 68   INCREASING POWER *  
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 09/12/2003 REFUELING OUTAGE    
Grand Gulf 1 100        
Palo Verde 1 98        
Palo Verde 2 98        
Palo Verde 3 99        
River Bend 1 100        
San Onofre 2 100        
San Onofre 3 100        
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021