Power Reactor Status Report for September 29, 2002
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BEAVER VALLEY 1 | 100 | ||||
| BEAVER VALLEY 2 | 100 | ||||
| CALVERT CLIFFS 1 | 100 | ||||
| CALVERT CLIFFS 2 | 100 | ||||
| FITZPATRICK 1 | 100 | ||||
| GINNA 1 | 100 | ||||
| HOPE CREEK 1 | 64 | ING POWER FOLLOWING MAINTENANCE *INCREASING POWER FOLLOWING MAINTENANCE | |||
| INDIAN POINT 2 | 100 | ||||
| INDIAN POINT 3 | 100 | ||||
| LIMERICK 1 | 100 | ||||
| LIMERICK 2 | 100 | ||||
| MILLSTONE 2 | 100 | ||||
| MILLSTONE 3 | 0 | 09/06/2002 | NG OUTAGE - CORE RELOADEDREFUELING OUTAGE - CORE RELOADED | ||
| NINE MILE POINT 1 | 100 | ||||
| NINE MILE POINT 2 | 100 | ||||
| OYSTER CREEK 1 | 100 | WN TO REFUELING OUTAGE *COASTDOWN TO REFUELING OUTAGE | |||
| PEACH BOTTOM 2 | 0 | 09/10/2002 | NG OUTAGE *REFUELING OUTAGE | ||
| PEACH BOTTOM 3 | 100 | ||||
| PILGRIM 1 | 100 | ||||
| SALEM 1 | 100 | ||||
| SALEM 2 | 100 | ||||
| SEABROOK 1 | 100 | ||||
| SUSQUEHANNA 1 | 100 | ||||
| SUSQUEHANNA 2 | 100 | ||||
| THREE MILE ISLAND 1 | 100 | ||||
| VERMONT YANKEE 1 | 94 | WN TO REFUELING OUTAGECOASTDOWN TO REFUELING OUTAGE |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BROWNS FERRY 1 | 0 | 03/03/1985 | DDEFUELED | ||
| BROWNS FERRY 2 | 90 | WN TO REFUELING OUTAGECOASTDOWN TO REFUELING OUTAGE | |||
| BROWNS FERRY 3 | 100 | ||||
| BRUNSWICK 1 | 27 | ING POWER FOLLOWING REFUELING OUTAGE *INCREASING POWER FOLLOWING REFUELING OUTAGE | |||
| BRUNSWICK 2 | 100 | ||||
| CATAWBA 1 | 100 | ||||
| CATAWBA 2 | 100 | ||||
| CRYSTAL RIVER 3 | 100 | ||||
| FARLEY 1 | 100 | ||||
| FARLEY 2 | 0 | 09/13/2002 | NG OUTAGE - DEFUELEDREFUELING OUTAGE - DEFUELED | ||
| HARRIS 1 | 100 | ||||
| HATCH 1 | 95 | ING POWER *INCREASING POWER | |||
| HATCH 2 | 100 | ||||
| MCGUIRE 1 | 0 | 09/13/2002 | NG OUTAGEREFUELING OUTAGE | ||
| MCGUIRE 2 | 100 | ||||
| NORTH ANNA 1 | 100 | ARED DUE TO LAKE LEVEL BELOW 246.0 FT - CURRENT LAKE LEVEL IS 245.4 FT.UE DECLARED DUE TO LAKE LEVEL BELOW 246.0 FT - CURRENT LAKE LEVEL IS 245.4 FT. | |||
| NORTH ANNA 2 | 0 | 09/07/2002 | ARED DUE TO LAKE LEVEL BELOW 246.0 FT - CURRENT LAKE LEVEL IS 245.4 FT REFUELING OUTAGE - DEFUELEDUE DECLARED DUE TO LAKE LEVEL BELOW 246.0 FT - CURRENT LAKE LEVEL IS 245.4 FT REFUELING OUTAGE - DEFUELED | ||
| OCONEE 1 | 100 | ||||
| OCONEE 2 | 99 | WN TO REFUELING OUTAGECOASTDOWN TO REFUELING OUTAGE | |||
| OCONEE 3 | 100 | ||||
| ROBINSON 2 | 100 | ||||
| SAINT LUCIE 1 | 45 | POWER AT 45% FOR PRE-OUTAGE WORK *HOLDING POWER AT 45% FOR PRE-OUTAGE WORK | |||
| SAINT LUCIE 2 | 100 | ||||
| SEQUOYAH 1 | 100 | ||||
| SEQUOYAH 2 | 100 | ||||
| SUMMER 1 | 100 | ||||
| SURRY 1 | 100 | ||||
| SURRY 2 | 100 | ||||
| TURKEY POINT 3 | 100 | ||||
| TURKEY POINT 4 | 100 | ||||
| VOGTLE 1 | 100 | ||||
| VOGTLE 2 | 96 | WN TO REFUELING OUTAGECOASTDOWN TO REFUELING OUTAGE | |||
| WATTS BAR 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BRAIDWOOD 1 | 100 | ||||
| BRAIDWOOD 2 | 100 | ||||
| BYRON 1 | 100 | ||||
| BYRON 2 | 0 | 09/16/2002 | NG OUTAGEREFUELING OUTAGE | ||
| CLINTON 1 | 93 | ECTRICAL CAPABILITY100% ELECTRICAL CAPABILITY | |||
| COOK 1 | 100 | ||||
| COOK 2 | 100 | ||||
| DAVIS BESSE 1 | 0 | 02/15/2002 | NG OUTAGE - DEFUELEDREFUELING OUTAGE - DEFUELED | ||
| DRESDEN 2 | 95 | ECTRICAL CAPABILITY *100% ELECTRICAL CAPABILITY | |||
| DRESDEN 3 | 88 | WN TO REFUELING OUTAGE *COASTDOWN TO REFUELING OUTAGE | |||
| DUANE ARNOLD 1 | 94 | ECTRICAL CAPABILITY100% ELECTRICAL CAPABILITY | |||
| FERMI 2 | 69 | POWER FOR TESTING *REDUCED POWER FOR TESTING | |||
| KEWAUNEE 1 | 100 | ||||
| LASALLE 1 | 98 | EDUCTION FOR ROD PATTERN ADJUSTMENTSPOWER REDUCTION FOR ROD PATTERN ADJUSTMENTS | |||
| LASALLE 2 | 68 | EDUCTION FOR ROD PATTERN ADJUSTMENTS *POWER REDUCTION FOR ROD PATTERN ADJUSTMENTS | |||
| MONTICELLO 1 | 100 | ||||
| PALISADES 1 | 85 | ING POWER FOLLOWING MAINTENANCE *INCREASING POWER FOLLOWING MAINTENANCE | |||
| PERRY 1 | 0 | 09/21/2002 | OUTAGEFORCED OUTAGE | ||
| POINT BEACH 1 | 0 | 09/13/2002 | NG OUTAGEREFUELING OUTAGE | ||
| POINT BEACH 2 | 100 | ||||
| PRAIRIE ISLAND 1 | 100 | ||||
| PRAIRIE ISLAND 2 | 100 | ||||
| QUAD CITIES 1 | 100 | ||||
| QUAD CITIES 2 | 100 |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| ARKANSAS NUCLEAR 1 | 77 | WN TO REFUELING OUTAGE *COASTDOWN TO REFUELING OUTAGE | |||
| ARKANSAS NUCLEAR 2 | 100 | ||||
| CALLAWAY 1 | 100 | ||||
| COLUMBIA GENERATING | 100 | ||||
| COMANCHE PEAK 1 | 0 | 09/27/2002 | NG OUTAGE *REFUELING OUTAGE | ||
| COMANCHE PEAK 2 | 100 | ||||
| COOPER 1 | 100 | ||||
| DIABLO CANYON 1 | 98 | DUE TO HIGH TURBINE GENERATOR VIBRATIONLIMITED DUE TO HIGH TURBINE GENERATOR VIBRATION | |||
| DIABLO CANYON 2 | 100 | ||||
| FT CALHOUN 1 | 100 | ||||
| GRAND GULF 1 | 0 | 09/13/2002 | NG OUTAGEREFUELING OUTAGE | ||
| PALO VERDE 1 | 0 | 09/27/2002 | N FOR REFUELING OUTAGE *SHUTDOWN FOR REFUELING OUTAGE | ||
| PALO VERDE 2 | 98 | TURE LIMITEDTEMPERATURE LIMITED | |||
| PALO VERDE 3 | 99 | TURE LIMITEDTEMPERATURE LIMITED | |||
| RIVER BEND 1 | 100 | ||||
| SAN ONOFRE 2 | 100 | ||||
| SAN ONOFRE 3 | 100 | ||||
| SOUTH TEXAS 1 | 100 | ||||
| SOUTH TEXAS 2 | 100 | ||||
| WATERFORD 3 | 100 | ||||
| WOLF CREEK 1 | 100 |
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021