The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for October 21, 2001

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100     *  
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100        
GINNA 1 100        
HOPE CREEK 1 0 10/09/2001 REFUELING OUTAGE *  
INDIAN POINT 2 100        
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 100        
MILLSTONE 2 100     *  
MILLSTONE 3 100        
NINE MILE POINT 1 100        
NINE MILE POINT 2 100     *  
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 100        
SALEM 1 89   REDUCED POWER DUE TO 500KV LINE OUTAGE *  
SALEM 2 100     *  
SEABROOK 1 100     *  
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 0 10/08/2001 REFUELING OUTAGE    
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 100        
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 0 09/15/2001 REFUELING OUTAGE    
CRYSTAL RIVER 3 0 09/29/2001 REFUELING OUTAGE    
FARLEY 1 0 10/05/2001 REFUELING OUTAGE - DEFUELED    
FARLEY 2 100        
HARRIS 1 0 09/21/2001 REFUELING OUTAGE - DEFUELED    
HATCH 1 100        
HATCH 2 0 09/15/2001 REFUELING OUTAGE    
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 98   COASTDOWN TO REFUELING OUTAGE *  
SEQUOYAH 2 100        
SUMMER 1 100        
SURRY 1 0 10/14/2001 REFUELING OUTAGE    
SURRY 2 100        
TURKEY POINT 3 0 09/29/2001 REFUELING OUTAGE    
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 62   HOLDING POWER AT THIS LEVEL DUE TO TURBINE GENERATOR VIBRATION    
BYRON 1 98   100% OF RATED ELECTRICAL CAPABILITY *  
BYRON 2 100     *  
CLINTON 1 100        
COOK 1 100        
COOK 2 100        
DAVIS BESSE 1 78   INCREASING POWER *  
DRESDEN 2 0 10/20/2001 REFUELING OUTAGE *  
DRESDEN 3 100        
DUANE ARNOLD 1 0 10/17/2001 MAINTENANCE OUTAGE    
FERMI 2 98   REDUCED POWER FOR ADMIN THERMAL LIMIT    
KEWAUNEE 1 0 09/23/2001 REFUELING OUTAGE - DEFUELED    
LASALLE 1 100        
LASALLE 2 100        
MONTICELLO 1 99   COASTDOWN TO REFUELING OUTAGE    
PALISADES 1 0 06/20/2001 MAINTENANCE OUTAGE    
PERRY 1 100        
POINT BEACH 1 100        
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 80   REDUCED POWER FOR CONTROL ROD DRIVE SURVEILLANCES *  
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100        
COLUMBIA GENERATING 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 98   COASTDOWN TO REFUELING OUTAGE    
DIABLO CANYON 1 100        
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 99     *  
PALO VERDE 2 0 10/10/2001 MAINTENANCE OUTAGE - PERFORMING CONTROL ELEMENT ASSEMBLY REPLACEMENTS    
PALO VERDE 3 0 09/28/2001 REFUELING OUTAGE - CORE RELOAD IN PROGRESS *  
RIVER BEND 1 100        
SAN ONOFRE 2 0 10/13/2001 MAINTENANCE OUTAGE *  
SAN ONOFRE 3 100        
SOUTH TEXAS 1 0 10/02/2001 REFUELING OUTAGE    
SOUTH TEXAS 2 100        
WATERFORD 3 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021