The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for May 21, 2001

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 100     *  
CALVERT CLIFFS 1 97   INCREASING POWER *  
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100        
GINNA 1 100        
HOPE CREEK 1 98   INCREASING POWER *  
INDIAN POINT 2 100        
INDIAN POINT 3 0 04/27/2001 REFUELING OUTAGE    
LIMERICK 1 100     *  
LIMERICK 2 100        
MILLSTONE 2 100        
MILLSTONE 3 100        
NINE MILE POINT 1 100        
NINE MILE POINT 2 95   INCREASING POWER *  
OYSTER CREEK 1 97   HOLDING FOR XENON TO BUILD IN. *  
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 31   INCREASING POWER *  
SALEM 1 71   HOLDING FOR NI CALS *  
SALEM 2 100        
SEABROOK 1 95   HOLDING POWER DUE TO LOSS OF A CIRCULATING WATER PUMP    
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100     *  
THREE MILE ISLAND 1 75   OBSERVING "A" MAIN TRANSFORMER GASES.    
VERMONT YANKEE 1 34   INCREASING POWER *  

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 98   INCREASING POWER *  
BRUNSWICK 2 61   POWER SUPPRESSION TESTING *  
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 0 05/18/2001 COMPLETED MAINTENANCE WORK ON THE FEEDWATER SYSTEM. *  
FARLEY 1 100        
FARLEY 2 100        
HARRIS 1 100        
HATCH 1 100        
HATCH 2 100        
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 0 04/25/2001 REFUELING OUTAGE    
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 96   INCREASING POWER *  
SUMMER 1 88   MAIN FEED PUMP WORK COMPLETED *  
SURRY 1 100        
SURRY 2 0 05/11/2001 MAINTENANCE OUTAGE *  
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 97   RECENTLY COMPLETED POWER UPRATE - POWER LIMITED BY TURBINE    
BRAIDWOOD 2 29   AUTOMATIC REACTOR TRIP ON 05/19/01, SEE EVENT # 38012. HOLDING POWER LEVEL FOR STEAM GENERATOR CHEMISTRY. *  
BYRON 1 98   RECENTLY COMPLETED POWER UPRATE - POWER LIMITED BY TURBINE    
BYRON 2 99   RECENTLY COMPLETED POWER UPRATE - POWER LIMITED BY TURBINE    
CLINTON 1 100        
COOK 1 100        
COOK 2 100        
DAVIS BESSE 1 100        
DRESDEN 2 100     *  
DRESDEN 3 100        
DUANE ARNOLD 1 0 04/12/2001 REFUELING OUTAGE    
FERMI 2 100        
KEWAUNEE 1 96   MAXIMUM POWER LEVEL DUE TO PLUGGED STEAM GENERATOR TUBES    
LASALLE 1 100        
LASALLE 2 100        
MONTICELLO 1 100        
PALISADES 1 100     *  
PERRY 1 25   SHUTTING PLANT DOWN DUE TO CIRC WATER PUMP PROBLEM *  
POINT BEACH 1 100        
POINT BEACH 2 100     *  
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 0 05/09/2001 MAINTENANCE OUTAGE    
QUAD CITIES 1 100        
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 0   PERFORMING LOW POWER PHYSICS TESTING, AT 1E-07 AMPS. *  
COLUMBIA GENERATING 0 05/19/2001 REFUELING OUTAGE    
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 100        
DIABLO CANYON 1 100        
DIABLO CANYON 2 0 04/28/2001 REFUELING OUTAGE    
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 98     *  
PALO VERDE 2 99        
PALO VERDE 3 0 05/19/2001 AUTOMATIC REACTOR TRIP ON 05/19/01, SEE EVENT # 38013. *  
RIVER BEND 1 100        
SAN ONOFRE 2 100        
SAN ONOFRE 3 0 02/03/2001 MAINTENANCE OUTAGE    
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 90   TESTING    
WATERFORD 3 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.