Power Reactor Status Report for March 4, 2001
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
BEAVER VALLEY 1 | 100 | | | | |
BEAVER VALLEY 2 | 100 | | | | |
CALVERT CLIFFS 1 | 100 | | | | |
CALVERT CLIFFS 2 | 98 | | COASTDOWN TO REFUELING OUTAGE | * | |
FITZPATRICK 1 | 100 | | | | |
GINNA 1 | 48 | | HOLDING POWER AT THIS LEVEL TO PERFORM CIRCULATING WATER PUMP WORK | * | |
HOPE CREEK 1 | 87 | | HOLDING POWER AT THIS LEVEL TO PERFORM TURBINE VALVE TESTING | * | |
INDIAN POINT 2 | 100 | | | | |
INDIAN POINT 3 | 100 | | | | |
LIMERICK 1 | 100 | | | | |
LIMERICK 2 | 93 | | COASTDOWN TO REFUELING OUTAGE | | |
MILLSTONE 2 | 100 | | | | |
MILLSTONE 3 | 0 | 02/03/2001 | REFUELING OUTAGE | | |
NINE MILE POINT 1 | 100 | | | | |
NINE MILE POINT 2 | 31 | | HOLDING POWER AT THIS LEVEL TO INVESTIGATE THE CAUSE OF A RECIRCULATION PUMP TRIP AFTER EXITING A PLANNED MAINTENANCE OUTAGE | * | |
OYSTER CREEK 1 | 96 | | INCREASING POWER AFTER DECREASING TO 84% POWER TO PERFORM A POWER TO FLOW SWAP | * | |
PEACH BOTTOM 2 | 100 | | | | |
PEACH BOTTOM 3 | 100 | | | | |
PILGRIM 1 | 100 | | | | |
SALEM 1 | 100 | | | | |
SALEM 2 | 100 | | | | |
SEABROOK 1 | 100 | | | | |
SUSQUEHANNA 1 | 100 | | | | |
SUSQUEHANNA 2 | 100 | | | | |
THREE MILE ISLAND 1 | 100 | | | | |
VERMONT YANKEE 1 | 100 | | | | |
Region 2
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
BROWNS FERRY 1 | 0 | 03/03/1985 | DEFUELED | | |
BROWNS FERRY 2 | 92 | | COASTDOWN TO REFUELING OUTAGE | * | |
BROWNS FERRY 3 | 100 | | | * | |
BRUNSWICK 1 | 100 | | | | |
BRUNSWICK 2 | 0 | 02/23/2001 | REFUELING OUTAGE - INITIAL FUEL SHUFFLE COMPLETE | | |
CATAWBA 1 | 100 | | | | |
CATAWBA 2 | 100 | | | | |
CRYSTAL RIVER 3 | 100 | | | | |
FARLEY 1 | 100 | | | | |
FARLEY 2 | 0 | 02/24/2001 | REFUELING OUTAGE - PREPARING TO LIFT UPPER INTERNALS | * | |
HARRIS 1 | 100 | | | | |
HATCH 1 | 100 | | | | |
HATCH 2 | 100 | | | | |
MCGUIRE 1 | 91 | | COASTDOWN TO REFUELING OUTAGE | * | |
MCGUIRE 2 | 100 | | | | |
NORTH ANNA 1 | 100 | | | | |
NORTH ANNA 2 | 72 | | COASTDOWN TO REFUELING OUTAGE | | |
OCONEE 1 | 100 | | | | |
OCONEE 2 | 100 | | | | |
OCONEE 3 | 0 | 02/16/2001 | MAINTENANCE OUTAGE | | |
ROBINSON 2 | 91 | | COASTDOWN TO REFUELING OUTAGE | * | |
SAINT LUCIE 1 | 100 | | | | |
SAINT LUCIE 2 | 100 | | . | | |
SEQUOYAH 1 | 100 | | | | |
SEQUOYAH 2 | 100 | | | | |
SUMMER 1 | 30 | | HOLDING POWER AT THIS LEVEL TO RESTORE A FEEDWATER PUMP AFTER EXITING A REFUELING OUTAGE AND TECH SPEC REQUIRED SHUTDOWN FROM 12% DUE TO FAILURE OF TWO FEEDWATER FLOW CHANNELS TO RESPOND DURING A PLANT STARTUP (Refer to event #37804) | * | |
SURRY 1 | 100 | | | | |
SURRY 2 | 100 | | | | |
TURKEY POINT 3 | 100 | | | | |
TURKEY POINT 4 | 100 | | | | |
VOGTLE 1 | 100 | | | | |
VOGTLE 2 | 100 | | | | |
WATTS BAR 1 | 100 | | | | |
Region 3
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
BRAIDWOOD 1 | 98 | | DECREASING POWER TO 95% TO PERFORM A FEEDWATER PUMP SWAP | * | |
BRAIDWOOD 2 | 100 | | | | |
BYRON 1 | 100 | | | | |
BYRON 2 | 80 | | HOLDING POWER AT THIS LEVEL TO PERFORM TURBINE VALVE TESTING | * | |
CLINTON 1 | 75 | | HOLDING POWER AT THIS LEVEL TO PERFORM A ROD SEQUENCE EXCHANGE | * | |
COOK 1 | 100 | | | | |
COOK 2 | 100 | | | | |
DAVIS BESSE 1 | 100 | | | | |
DRESDEN 2 | 100 | | | | |
DRESDEN 3 | 70 | | HOLDING POWER AT THIS LEVEL TO PERFORM DEEP/SHALLOW ROD SWAPS | * | |
DUANE ARNOLD 1 | 100 | | | | |
FERMI 2 | 70 | | DECREASING POWER TO 60% TO REPLACE AIR-OPERATED VALVE CONTROLS ON A NORMAL DRAIN LINE FROM THE 6 SOUTH HEATER TO THE 5 SOUTH HEATER - PROBLEM CAUSED FEEDWATER HEATER OSCILLATIONS | * | |
KEWAUNEE 1 | 96 | | MAXIMUM POWER LEVEL DUE TO PLUGGED STEAM GENERATOR TUBES | * | |
LASALLE 1 | 100 | | | | |
LASALLE 2 | 100 | | | | |
MONTICELLO 1 | 0 | 02/25/2001 | MAINTENANCE OUTAGE TO PERFORM INSERVICE INSPECTIONS | | |
PALISADES 1 | 100 | | | | |
PERRY 1 | 0 | 02/16/2001 | REFUELING OUTAGE - FUEL RELOAD AND SHUFFLE IN PROGRESS | | |
POINT BEACH 1 | 100 | | | | |
POINT BEACH 2 | 100 | | | | |
PRAIRIE ISLAND 1 | 100 | | | | |
PRAIRIE ISLAND 2 | 100 | | | | |
QUAD CITIES 1 | 100 | | | | |
QUAD CITIES 2 | 100 | | | | |
Region 4
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
ARKANSAS NUCLEAR 1 | 100 | | | | |
ARKANSAS NUCLEAR 2 | 100 | | | | |
CALLAWAY 1 | 57 | | INCREASING POWER AT A RATE OF 3% PER HOUR AFTER DECREASING TO 45% TO REPLACE A REACTOR COOLANT SYSTEM FLOW TRANSMITTER | * | |
COLUMBIA GENERATING | 100 | | | | |
COMANCHE PEAK 1 | 100 | | | | |
COMANCHE PEAK 2 | 100 | | | | |
COOPER 1 | 0 | 03/03/2001 | MID-CYCLE MAINTENANCE OUTAGE TO EXCHANGE A FUEL LEAKER BUNDLE - AUTOMATIC SCRAM ON LOW REACTOR WATER LEVEL DURING THE PLANNED SHUTDOWN FOLLOWED BY A MANUAL SCRAM IN ANTICIPATION OF LOW REACTOR WATER LEVEL (Refer to event #37805) | * | 2 |
DIABLO CANYON 1 | 100 | | | | |
DIABLO CANYON 2 | 100 | | | | |
FT CALHOUN 1 | 30 | | HOLDING POWER AT THIS LEVEL AS PART OF A COASTDOWN TO REFUELING OUTAGE AND TO MINIMIZE ACTIVITY IN COOLANT PRIOR TO OUTAGE | * | |
GRAND GULF 1 | 100 | | | | |
PALO VERDE 1 | 100 | | | | |
PALO VERDE 2 | 99 | | | | |
PALO VERDE 3 | 100 | | | | |
RIVER BEND 1 | 100 | | | | |
SAN ONOFRE 2 | 100 | | | | |
SAN ONOFRE 3 | 0 | 02/03/2001 | MAINTENANCE OUTAGE | | |
SOUTH TEXAS 1 | 100 | | | | |
SOUTH TEXAS 2 | 83 | | INCREASING POWER AFTER RECOVERING FROM A MANUAL REACTOR TRIP FROM 95% POWER DUE TO LOSS OF AN OPERATING CIRCULATING WATER PUMP (Refer to event #37794) - PLAN TO PERFORM NUCLEAR INSTRUMENTATION CALIBRATIONS AT 90% POWER AND CONTINUE COASTDOWN AT 94% POWER | * | |
WATERFORD 3 | 100 | | | | |
WOLF CREEK 1 | 100 | | | | |
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:
- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.