Power Reactor Status Report for January 13, 2001
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
BEAVER VALLEY 1 | 100 | | | | |
BEAVER VALLEY 2 | 100 | | | | |
CALVERT CLIFFS 1 | 100 | | | | |
CALVERT CLIFFS 2 | 100 | | | | |
FITZPATRICK 1 | 100 | | | | |
GINNA 1 | 100 | | | | |
HOPE CREEK 1 | 100 | | | | |
INDIAN POINT 2 | 29 | | MANAGEMENT HOLD AFTER EXITING A MAINTENANCE/REFUELING OUTAGE | * | |
INDIAN POINT 3 | 100 | | | | |
LIMERICK 1 | 100 | | | | |
LIMERICK 2 | 98 | | COASTDOWN TO REFUELING OUTAGE | * | |
MILLSTONE 2 | 85 | | INCREASING POWER TO 90% AFTER DECREASING TO 85% POWER TO PERFORM REPAIRS ON THE 'A' CONDENSATE PUMP | * | |
MILLSTONE 3 | 89 | | COASTDOWN TO REFUELING OUTAGE | | |
NINE MILE POINT 1 | 100 | | | | |
NINE MILE POINT 2 | 100 | | | | |
OYSTER CREEK 1 | 95 | | HOLDING POWER AT THIS LEVEL DUE TO A REHEATER DRAIN TANK LEVEL COLUMN PROBLEM - REPAIR PLANNING IN PROGRESS | * | |
PEACH BOTTOM 2 | 100 | | | | |
PEACH BOTTOM 3 | 100 | | | | |
PILGRIM 1 | 100 | | | | |
SALEM 1 | 100 | | | | |
SALEM 2 | 42 | | HOLDING POWER AT THIS LEVEL TO PERFORM PLANNED MAINTENANCE ON THE 22 STEAM GENERATOR FEEDWATER PUMP AND THE 23 CONDENSATE PUMP | * | |
SEABROOK 1 | 0 | 10/20/2000 | REFUELING OUTAGE - 'B' DIESEL GENERATOR REPAIRS IN PROGRESS | * | |
SUSQUEHANNA 1 | 100 | | | | |
SUSQUEHANNA 2 | 100 | | | | |
THREE MILE ISLAND 1 | 100 | | | | |
VERMONT YANKEE 1 | 100 | | | | |
Region 2
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
BROWNS FERRY 1 | 0 | 03/03/1985 | DEFUELED | | |
BROWNS FERRY 2 | 100 | | | | |
BROWNS FERRY 3 | 100 | | | | |
BRUNSWICK 1 | 100 | | | | |
BRUNSWICK 2 | 100 | | | | |
CATAWBA 1 | 100 | | | | |
CATAWBA 2 | 100 | | | | |
CRYSTAL RIVER 3 | 100 | | | | |
FARLEY 1 | 100 | | | | |
FARLEY 2 | 100 | | | | |
HARRIS 1 | 100 | | | | |
HATCH 1 | 100 | | | | |
HATCH 2 | 100 | | | | |
MCGUIRE 1 | 100 | | | | |
MCGUIRE 2 | 100 | | | | |
NORTH ANNA 1 | 100 | | | | |
NORTH ANNA 2 | 100 | | | | |
OCONEE 1 | 17 | | EXITING REFUELING OUTAGE - PLAN TO PLACE UNIT ON LINE WITHIN 1 HOUR | * | |
OCONEE 2 | 100 | | | | |
OCONEE 3 | 100 | | | | |
ROBINSON 2 | 100 | | | | |
SAINT LUCIE 1 | 100 | | | | |
SAINT LUCIE 2 | 100 | | . | | |
SEQUOYAH 1 | 100 | | | | |
SEQUOYAH 2 | 100 | | | | |
SUMMER 1 | 0 | 10/07/2000 | REFUELING OUTAGE - DEFUELED - 'A' HOT LEG REPAIRS IN PROGRESS | * | |
SURRY 1 | 100 | | | | |
SURRY 2 | 100 | | | | |
TURKEY POINT 3 | 100 | | | | |
TURKEY POINT 4 | 100 | | | | |
VOGTLE 1 | 100 | | | | |
VOGTLE 2 | 100 | | | | |
WATTS BAR 1 | 100 | | | | |
Region 3
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
BRAIDWOOD 1 | 100 | | | | |
BRAIDWOOD 2 | 100 | | | | |
BYRON 1 | 100 | | | | |
BYRON 2 | 100 | | | | |
CLINTON 1 | 100 | | | | |
COOK 1 | 69 | | HOLDING POWER AT THIS LEVEL TO PERFORM THERMAL POWER CALCULATIONS | * | |
COOK 2 | 100 | | | | |
DAVIS BESSE 1 | 100 | | | | |
DRESDEN 2 | 100 | | | | |
DRESDEN 3 | 100 | | | | |
DUANE ARNOLD 1 | 56 | | HOLDING POWER AT THIS LEVEL TO PERFORM A ROD SEQUENCE EXCHANGE - COMPLETE - PLAN TO DECREASE POWER TO EITHER 30 OR 35% POWER TO REPLACE RECIRCULATION PUMP MG SET BRUSHES WHILE IN SINGLE LOOP OPERATION | * | |
FERMI 2 | 100 | | | | |
KEWAUNEE 1 | 96 | | MAXIMUM POWER LEVEL DUE TO PLUGGED STEAM GENERATOR TUBES | | |
LASALLE 1 | 100 | | | | |
LASALLE 2 | 100 | | | | |
MONTICELLO 1 | 100 | | | | |
PALISADES 1 | 100 | | | | |
PERRY 1 | 97 | | COASTDOWN TO REFUELING OUTAGE | | |
POINT BEACH 1 | 100 | | | | |
POINT BEACH 2 | 100 | | | | |
PRAIRIE ISLAND 1 | 82 | | COASTDOWN TO REFUELING OUTAGE | * | |
PRAIRIE ISLAND 2 | 100 | | | | |
QUAD CITIES 1 | 100 | | | | |
QUAD CITIES 2 | 100 | | | | |
Region 4
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
ARKANSAS NUCLEAR 1 | 100 | | | | |
ARKANSAS NUCLEAR 2 | 17 | | HOLDING POWER AT THIS LEVEL WITH THE UNIT OFF LINE DUE TO SECONDARY SYSTEM CONTAMINATION (SULFATE AND CHLORIDE) INGRESS AND CONCURRENT HIGH TURBINE GENERATOR VIBRATION | * | |
CALLAWAY 1 | 100 | | | | |
COLUMBIA GENERATING | 92 | | INCREASING POWER AFTER DECREASING TO 80% POWER TO PERFORM TURBINE FRONT STANDARD TESTING AND ROD LINE ADJUSTMENTS - LICENSE AMENDMENT ISSUED FOR NAME CHANGE FROM WNP-2 ON 01/08/2001 | * | |
COMANCHE PEAK 1 | 100 | | | | |
COMANCHE PEAK 2 | 100 | | | | |
COOPER 1 | 100 | | | | |
DIABLO CANYON 1 | 100 | | | * | |
DIABLO CANYON 2 | 100 | | | * | |
FT CALHOUN 1 | 100 | | | | |
GRAND GULF 1 | 100 | | | | |
PALO VERDE 1 | 100 | | | | |
PALO VERDE 2 | 100 | | | | |
PALO VERDE 3 | 99 | | | | |
RIVER BEND 1 | 100 | | | | |
SAN ONOFRE 2 | 100 | | | | |
SAN ONOFRE 3 | 0 | 01/02/2001 | REFUELING OUTAGE - DEFUELED | | |
SOUTH TEXAS 1 | 100 | | | | |
SOUTH TEXAS 2 | 99 | | INCREASING POWER AFTER DECREASING TO 98% POWER TO PERFORM TURBINE VALVE TESTING | * | |
WATERFORD 3 | 100 | | | | |
WOLF CREEK 1 | 100 | | | | |
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:
- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.