Power Reactor Status Report for January 13, 2001
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BEAVER VALLEY 1 | 100 | ||||
| BEAVER VALLEY 2 | 100 | ||||
| CALVERT CLIFFS 1 | 100 | ||||
| CALVERT CLIFFS 2 | 100 | ||||
| FITZPATRICK 1 | 100 | ||||
| GINNA 1 | 100 | ||||
| HOPE CREEK 1 | 100 | ||||
| INDIAN POINT 2 | 29 | MANAGEMENT HOLD AFTER EXITING A MAINTENANCE/REFUELING OUTAGE | * | ||
| INDIAN POINT 3 | 100 | ||||
| LIMERICK 1 | 100 | ||||
| LIMERICK 2 | 98 | COASTDOWN TO REFUELING OUTAGE | * | ||
| MILLSTONE 2 | 85 | INCREASING POWER TO 90% AFTER DECREASING TO 85% POWER TO PERFORM REPAIRS ON THE 'A' CONDENSATE PUMP | * | ||
| MILLSTONE 3 | 89 | COASTDOWN TO REFUELING OUTAGE | |||
| NINE MILE POINT 1 | 100 | ||||
| NINE MILE POINT 2 | 100 | ||||
| OYSTER CREEK 1 | 95 | HOLDING POWER AT THIS LEVEL DUE TO A REHEATER DRAIN TANK LEVEL COLUMN PROBLEM - REPAIR PLANNING IN PROGRESS | * | ||
| PEACH BOTTOM 2 | 100 | ||||
| PEACH BOTTOM 3 | 100 | ||||
| PILGRIM 1 | 100 | ||||
| SALEM 1 | 100 | ||||
| SALEM 2 | 42 | HOLDING POWER AT THIS LEVEL TO PERFORM PLANNED MAINTENANCE ON THE 22 STEAM GENERATOR FEEDWATER PUMP AND THE 23 CONDENSATE PUMP | * | ||
| SEABROOK 1 | 0 | 10/20/2000 | REFUELING OUTAGE - 'B' DIESEL GENERATOR REPAIRS IN PROGRESS | * | |
| SUSQUEHANNA 1 | 100 | ||||
| SUSQUEHANNA 2 | 100 | ||||
| THREE MILE ISLAND 1 | 100 | ||||
| VERMONT YANKEE 1 | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BROWNS FERRY 1 | 0 | 03/03/1985 | DEFUELED | ||
| BROWNS FERRY 2 | 100 | ||||
| BROWNS FERRY 3 | 100 | ||||
| BRUNSWICK 1 | 100 | ||||
| BRUNSWICK 2 | 100 | ||||
| CATAWBA 1 | 100 | ||||
| CATAWBA 2 | 100 | ||||
| CRYSTAL RIVER 3 | 100 | ||||
| FARLEY 1 | 100 | ||||
| FARLEY 2 | 100 | ||||
| HARRIS 1 | 100 | ||||
| HATCH 1 | 100 | ||||
| HATCH 2 | 100 | ||||
| MCGUIRE 1 | 100 | ||||
| MCGUIRE 2 | 100 | ||||
| NORTH ANNA 1 | 100 | ||||
| NORTH ANNA 2 | 100 | ||||
| OCONEE 1 | 17 | EXITING REFUELING OUTAGE - PLAN TO PLACE UNIT ON LINE WITHIN 1 HOUR | * | ||
| OCONEE 2 | 100 | ||||
| OCONEE 3 | 100 | ||||
| ROBINSON 2 | 100 | ||||
| SAINT LUCIE 1 | 100 | ||||
| SAINT LUCIE 2 | 100 | . | |||
| SEQUOYAH 1 | 100 | ||||
| SEQUOYAH 2 | 100 | ||||
| SUMMER 1 | 0 | 10/07/2000 | REFUELING OUTAGE - DEFUELED - 'A' HOT LEG REPAIRS IN PROGRESS | * | |
| SURRY 1 | 100 | ||||
| SURRY 2 | 100 | ||||
| TURKEY POINT 3 | 100 | ||||
| TURKEY POINT 4 | 100 | ||||
| VOGTLE 1 | 100 | ||||
| VOGTLE 2 | 100 | ||||
| WATTS BAR 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BRAIDWOOD 1 | 100 | ||||
| BRAIDWOOD 2 | 100 | ||||
| BYRON 1 | 100 | ||||
| BYRON 2 | 100 | ||||
| CLINTON 1 | 100 | ||||
| COOK 1 | 69 | HOLDING POWER AT THIS LEVEL TO PERFORM THERMAL POWER CALCULATIONS | * | ||
| COOK 2 | 100 | ||||
| DAVIS BESSE 1 | 100 | ||||
| DRESDEN 2 | 100 | ||||
| DRESDEN 3 | 100 | ||||
| DUANE ARNOLD 1 | 56 | HOLDING POWER AT THIS LEVEL TO PERFORM A ROD SEQUENCE EXCHANGE - COMPLETE - PLAN TO DECREASE POWER TO EITHER 30 OR 35% POWER TO REPLACE RECIRCULATION PUMP MG SET BRUSHES WHILE IN SINGLE LOOP OPERATION | * | ||
| FERMI 2 | 100 | ||||
| KEWAUNEE 1 | 96 | MAXIMUM POWER LEVEL DUE TO PLUGGED STEAM GENERATOR TUBES | |||
| LASALLE 1 | 100 | ||||
| LASALLE 2 | 100 | ||||
| MONTICELLO 1 | 100 | ||||
| PALISADES 1 | 100 | ||||
| PERRY 1 | 97 | COASTDOWN TO REFUELING OUTAGE | |||
| POINT BEACH 1 | 100 | ||||
| POINT BEACH 2 | 100 | ||||
| PRAIRIE ISLAND 1 | 82 | COASTDOWN TO REFUELING OUTAGE | * | ||
| PRAIRIE ISLAND 2 | 100 | ||||
| QUAD CITIES 1 | 100 | ||||
| QUAD CITIES 2 | 100 |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| ARKANSAS NUCLEAR 1 | 100 | ||||
| ARKANSAS NUCLEAR 2 | 17 | HOLDING POWER AT THIS LEVEL WITH THE UNIT OFF LINE DUE TO SECONDARY SYSTEM CONTAMINATION (SULFATE AND CHLORIDE) INGRESS AND CONCURRENT HIGH TURBINE GENERATOR VIBRATION | * | ||
| CALLAWAY 1 | 100 | ||||
| COLUMBIA GENERATING | 92 | INCREASING POWER AFTER DECREASING TO 80% POWER TO PERFORM TURBINE FRONT STANDARD TESTING AND ROD LINE ADJUSTMENTS - LICENSE AMENDMENT ISSUED FOR NAME CHANGE FROM WNP-2 ON 01/08/2001 | * | ||
| COMANCHE PEAK 1 | 100 | ||||
| COMANCHE PEAK 2 | 100 | ||||
| COOPER 1 | 100 | ||||
| DIABLO CANYON 1 | 100 | * | |||
| DIABLO CANYON 2 | 100 | * | |||
| FT CALHOUN 1 | 100 | ||||
| GRAND GULF 1 | 100 | ||||
| PALO VERDE 1 | 100 | ||||
| PALO VERDE 2 | 100 | ||||
| PALO VERDE 3 | 99 | ||||
| RIVER BEND 1 | 100 | ||||
| SAN ONOFRE 2 | 100 | ||||
| SAN ONOFRE 3 | 0 | 01/02/2001 | REFUELING OUTAGE - DEFUELED | ||
| SOUTH TEXAS 1 | 100 | ||||
| SOUTH TEXAS 2 | 99 | INCREASING POWER AFTER DECREASING TO 98% POWER TO PERFORM TURBINE VALVE TESTING | * | ||
| WATERFORD 3 | 100 | ||||
| WOLF CREEK 1 | 100 |
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021