Power Reactor Status Report for November 14, 1999
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BEAVER VALLEY 1 | 46 | HOLDING POWER AT THIS LEVEL DUE TO GRID DEMAND - EHC POWER SUPPLY REPLACEMEN | * | ||
BEAVER VALLEY 2 | 100 | ||||
CALVERT CLIFFS 1 | 100 | ||||
CALVERT CLIFFS 2 | 100 | ||||
FITZPATRICK 1 | 91 | INCREASING POWER FOLLOWING SCRAM RECOVERY AND A FORCED OUTAGE | * | ||
GINNA 1 | 98 | INCREASING POWER AFTER PERFORMING A LOAD REDUCTION TO APPROXIMATELY 50% POWE | * | ||
HOPE CREEK 1 | 87 | HOLDING POWER AT THIS LEVEL TO PERFORM TURBINE VALVE TESTING | * | ||
INDIAN POINT 2 | 99 | ||||
INDIAN POINT 3 | 61 | HOLDING POWER AT THIS LEVEL - PREPARING TO PLACE MAIN BOILER FEED PUMP ON LI | * | ||
LIMERICK 1 | 100 | ||||
LIMERICK 2 | 100 | ||||
MILLSTONE 2 | 100 | ||||
MILLSTONE 3 | 100 | ||||
NINE MILE POINT 1 | 1 | EXITING A MAINTENANCE OUTAGE FOR RECIRC PUMP SEAL REPLACEMENT | * | ||
NINE MILE POINT 2 | 100 | ||||
OYSTER CREEK 1 | 100 | ||||
PEACH BOTTOM 2 | 100 | ||||
PEACH BOTTOM 3 | 75 | HOLDING POWER AT THIS LEVEL TO PERFORM PCIS GROUP 1 LOGIC TESTING | * | ||
PILGRIM 1 | 100 | ||||
SALEM 1 | 100 | ||||
SALEM 2 | 93 | INCREASING POWER AFTER PERFORMING MAINTENANCE ON MAIN FEEDWATER PUMP | * | ||
SEABROOK 1 | 100 | ||||
SUSQUEHANNA 1 | 100 | ||||
SUSQUEHANNA 2 | 100 | ||||
THREE MILE ISLAND 1 | 100 | ||||
VERMONT YANKEE 1 | 0 | 10/29/1999 | REFUELING OUTAGE - FUEL PARTIALLY OFFLOADED | * |
Region 2
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BROWNS FERRY 1 | 0 | 03/03/1985 | DEFUELED | ||
BROWNS FERRY 2 | 100 | ||||
BROWNS FERRY 3 | 100 | * | |||
BRUNSWICK 1 | 100 | ||||
BRUNSWICK 2 | 100 | ||||
CATAWBA 1 | 50 | PERFORMING MAINTENANCE ON MAIN GENERATOR CIRCUIT BREAKERS | |||
CATAWBA 2 | 100 | ||||
CRYSTAL RIVER 3 | 70 | HOLDING POWER AT THIS LEVEL AFTER EXITING A REFUELING OUTAGE | * | ||
FARLEY 1 | 100 | ||||
FARLEY 2 | 0 | 10/15/1999 | REFUELING OUTAGE - DEFUELED - CLOSING STEAM GENERATORS | * | |
HARRIS 1 | 100 | ||||
HATCH 1 | 100 | ||||
HATCH 2 | 98 | MAXIMUM OPERATING POWER | * | ||
MCGUIRE 1 | 100 | * | |||
MCGUIRE 2 | 100 | ||||
NORTH ANNA 1 | 100 | ||||
NORTH ANNA 2 | 100 | ||||
OCONEE 1 | 100 | * | |||
OCONEE 2 | 0 | 11/04/1999 | REFUELING OUTAGE - FUEL OFFLOAD IN PROGRESS | * | |
OCONEE 3 | 100 | ||||
ROBINSON 2 | 100 | ||||
SAINT LUCIE 1 | 100 | ||||
SAINT LUCIE 2 | 100 | ||||
SEQUOYAH 1 | 100 | * | |||
SEQUOYAH 2 | 100 | ||||
SUMMER 1 | 100 | ||||
SURRY 1 | 100 | ||||
SURRY 2 | 100 | ||||
TURKEY POINT 3 | 100 | ||||
TURKEY POINT 4 | 100 | ||||
VOGTLE 1 | 100 | ||||
VOGTLE 2 | 100 | ||||
WATTS BAR 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BRAIDWOOD 1 | 100 | ||||
BRAIDWOOD 2 | 100 | ||||
BYRON 1 | 100 | ||||
BYRON 2 | 0 | 10/23/1999 | EXITING REFUELING OUTAGE | * | |
CLINTON 1 | 100 | ||||
COOK 1 | 0 | 09/08/1997 | REFUELING OUTAGE - DEFUELED | ||
COOK 2 | 0 | 09/09/1997 | REFUELING OUTAGE - DEFUELED | ||
DAVIS BESSE 1 | 100 | ||||
DRESDEN 2 | 42 | INCREASING POWER TO APPROXIMATELY 55% TO CONTINUE TROUBLESHOOTING CONDENSATE | * | ||
DRESDEN 3 | 100 | ||||
DUANE ARNOLD 1 | 0 | 10/22/1999 | REFUELING OUTAGE - SECOND FUEL SHUFFLE COMPLETE | * | |
FERMI 2 | 97 | ||||
KEWAUNEE 1 | 97 | ||||
LASALLE 1 | 0 | 10/23/1999 | REFUELING OUTAGE - FUEL SHUFFLE IN PROGRESS | * | |
LASALLE 2 | 100 | ||||
MONTICELLO 1 | 99 | COASTDOWN TO REFUELING OUTAGE | |||
PALISADES 1 | 0 | 10/15/1999 | REFUELING OUTAGE - REDUCED INVENTORY (AT TOP OF HOT LEG) | * | |
PERRY 1 | 100 | ||||
POINT BEACH 1 | 0 | 10/15/1999 | REFUELING OUTAGE - FUEL RELOAD IN PROGRESS | * | |
POINT BEACH 2 | 100 | ||||
PRAIRIE ISLAND 1 | 100 | ||||
PRAIRIE ISLAND 2 | 100 | ||||
QUAD CITIES 1 | 100 | * | |||
QUAD CITIES 2 | 60 | HOLDING POWER AT THIS LEVEL FOR FLUX MONITORING TESTING TO IDENTIFY A POTENT | * |
Region 4
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
ARKANSAS NUCLEAR 1 | 100 | ||||
ARKANSAS NUCLEAR 2 | 0 | 11/06/1999 | MAINTENANCE OUTAGE - INSPECTING STEAM GENERATOR TUBES | ||
CALLAWAY 1 | 100 | ||||
COMANCHE PEAK 1 | 100 | ||||
COMANCHE PEAK 2 | 100 | ||||
COOPER 1 | 100 | ||||
DIABLO CANYON 1 | 100 | ||||
DIABLO CANYON 2 | 100 | ||||
FT CALHOUN 1 | 30 | HOLDING DUE TO WATER CHEMISTRY | |||
GRAND GULF 1 | 0 | 10/22/1999 | REFUELING OUTAGE - FUEL RELOAD AND CORE SHUFFLE IN PROGRESS | * | |
PALO VERDE 1 | 100 | * | |||
PALO VERDE 2 | 100 | ||||
PALO VERDE 3 | 100 | ||||
RIVER BEND 1 | 100 | ||||
SAN ONOFRE 2 | 100 | ||||
SAN ONOFRE 3 | 100 | ||||
SOUTH TEXAS 1 | 100 | ||||
SOUTH TEXAS 2 | 80 | HOLDING POWER AT THIS LEVEL TO REPAIR MAIN FEEDWATER PUMP #21 AFTER EXITING | * | ||
WASHINGTON NUCLEAR 2 | 100 | ||||
WATERFORD 3 | 100 | ||||
WOLF CREEK 1 | 100 |