Power Reactor Status Report for November 9, 1999

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 100        
FITZPATRICK 1 0 11/05/1999 HOLDING AT 30 PSIG FOR NOBLE METAL INJECTION    
GINNA 1 100        
HOPE CREEK 1 100        
INDIAN POINT 2 99        
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 100        
MILLSTONE 2 99     *  
MILLSTONE 3 100        
NINE MILE POINT 1 0 10/28/1999 REPAIRING #11 RECIRC PUMP    
NINE MILE POINT 2 100        
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 100        
SALEM 1 100        
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 0 10/29/1999 REFUELING OUTAGE    

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 100        
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 0 10/01/1999 EXITING REFUELING OUTAGE *  
FARLEY 1 100     *  
FARLEY 2 0 10/15/1999 REFUELING OUTAGE - DEFUELED    
HARRIS 1 100        
HATCH 1 100        
HATCH 2 98   MAXIMUM OPERATING POWER    
MCGUIRE 1 100     *  
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 0 11/04/1999 REFUELING OUTAGE    
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 100        
SURRY 1 100        
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 40   CONDENSER WATERBOX CLEANING *  
VOGTLE 1 100        
VOGTLE 2 82   INCREASING POWER *  
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100        
BYRON 1 100        
BYRON 2 0 10/23/1999 REFUELING OUTAGE *  
CLINTON 1 100        
COOK 1 0 09/08/1997 REFUELING OUTAGE - DEFUELED    
COOK 2 0 09/09/1997 REFUELING OUTAGE - DEFUELED    
DAVIS BESSE 1 100        
DRESDEN 2 100        
DRESDEN 3 100        
DUANE ARNOLD 1 0 10/22/1999 REFUELING OUTAGE    
FERMI 2 97        
KEWAUNEE 1 97        
LASALLE 1 0 10/22/1999 REFUELING OUTAGE    
LASALLE 2 100        
MONTICELLO 1 100        
PALISADES 1 0 10/15/1999 REFUELING OUTAGE *  
PERRY 1 100        
POINT BEACH 1 0 10/15/1999 REFUELING OUTAGE - DEFUELED    
POINT BEACH 2 100     *  
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 100        
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 0 11/06/1999 MID CYCLE OUTAGE *  
CALLAWAY 1 73   HOLDING POWER *  
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 100        
DIABLO CANYON 1 100        
DIABLO CANYON 2 100        
FT CALHOUN 1 0 10/01/1999 EXITING REFUELING OUTAGE *  
GRAND GULF 1 0 10/22/1999 REFUELING OUTAGE    
PALO VERDE 1 10   HOLDING POWER    
PALO VERDE 2 100        
PALO VERDE 3 100        
RIVER BEND 1 100        
SAN ONOFRE 2 100        
SAN ONOFRE 3 100        
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 10   HOLD FOR EHC REPAIR *  
WASHINGTON NUCLEAR 2 100        
WATERFORD 3 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021