The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Part 21 Report - 1999-080

 

 

LICENSEE: ABB COMBUSTION ENGINEERING
SITE: ABB COMBUSTION ENGINEERING EN NUMBER: 35273
DOCKET:   EVENT DATE: 01-15-99
RX TYPE:   EVENT TIME: 16:37
VENDORS:   NOTIFY DATE: 01-15-99
EMERGENCY CLASS: N/A REGION: 1 STATE: CT TIME: 16:37
OPS OFFICER: STEVE SANDIN
10 CFR SECTION: CCCC UNSPECIFIED PARAGRAPH

PART 21 NOTIFICATION RELATED TO THE XL-S96 CPR CORRELATION FOR SVEA-96 FUEL

"The purpose of this letter is to notify the Nuclear Regulatory Commission of a defect as defined in 10 CFR 21, 'Reporting of Defects and Noncompliance.' The defect concerns the XL-S96 Critical Power Ratio (CPR) correlation for ABB SVEA-96 fuel assemblies for Boiling Water Reactors (BWRs). Specifically, the defect concerns the XL-S96 CPR correlation, which is based solely on a cosine axial power shape. The defect could lead to non-conservative Operating Limit MCPRs and monitored CPRs for top-peaked axial power shapes.

"The Enclosure summarizes the evaluation performed by ABB Combustion Engineering (ABB-CE). If you have any questions, please feel free to contact me [Ian C. Rickard] or Mr. Virgil Paggen of my staff."

This event effects WNP-2 current operating cycle (Cycle 14).


 

Page Last Reviewed/Updated Thursday, March 25, 2021