Part 21 Report - 1999-080
LICENSEE: |
ABB COMBUSTION ENGINEERING |
SITE: |
ABB COMBUSTION ENGINEERING |
EN NUMBER: |
35273 |
DOCKET: |
|
EVENT DATE: |
01-15-99 |
RX TYPE: |
|
EVENT TIME: |
16:37 |
VENDORS: |
|
NOTIFY DATE: |
01-15-99 |
EMERGENCY CLASS: |
N/A REGION: 1 |
STATE: CT |
TIME: 16:37 |
OPS OFFICER: |
STEVE SANDIN |
10 CFR SECTION: |
CCCC UNSPECIFIED PARAGRAPH |
PART 21 NOTIFICATION RELATED TO THE XL-S96 CPR CORRELATION FOR SVEA-96 FUEL
"The purpose of this letter is to notify the Nuclear Regulatory Commission of a defect as defined in 10 CFR 21, 'Reporting of Defects and Noncompliance.' The defect concerns the XL-S96 Critical Power Ratio (CPR) correlation for ABB SVEA-96 fuel assemblies for Boiling Water Reactors (BWRs). Specifically, the defect concerns the XL-S96 CPR correlation, which is based solely on a cosine axial power shape. The defect could lead to non-conservative Operating Limit MCPRs and monitored CPRs for top-peaked axial power shapes.
"The Enclosure summarizes the evaluation performed by ABB Combustion Engineering (ABB-CE). If you have any questions, please feel free to contact me [Ian C. Rickard] or Mr. Virgil Paggen of my staff."
This event effects WNP-2 current operating cycle (Cycle 14).
Page Last Reviewed/Updated Thursday, March 25, 2021