ACCESSION #: 9801290049



                              The Boeing Company

                              P.O. Box 3707

                              Seattle, WA 98124-2207



BOEING



January 22, 1998

G-1151-SJA-98-049



Document Control Desk

United States Nuclear Regulatory Commission

Washington, D.C. 20555



Reference:  a) Boeing Letter G-1151-RSO-92-365 dated August 31, 1992; R.

               S. Orr to the NRC Operations Center



            b) NRC Letter Docket No. 99901227 dated August 12, 1992; L.

               J. Norrholm to R. S. Orr; Subject: Response to 10 CFR 21

               Inquiry



Dear Sir or Madam:



In accordance with the reference correspondence and 10 CFR 21, Boeing is

sending the NRC the attached error notice(s) received from our former

software suppliers.  Because of unknown current addresses, the following

former customers were not notified:



     Reactor Controls, Inc.



     Echo Energy Consultants, Inc.



     Nuclear Applications and Systems Analysis Company (Japan)



     Nuclear Power Services



Error notices have been sent to our other former customers.



Very truly yours,





Sandra J. Andrews

Nuclear Administrator

Phone: (425) 865-6248

FAX: (425) 865-4851

Mail Stop: 7A-33, or

e-mail: Sandra.J.Andrews@Boeing.com



Enclosure(s):  GTSTRUDL Program Report Form 98.01





Georgia Institute

  of Technology                          GT STRUDL [Registered Trademark]





January 15, 1998



Attention:  Nuclear Administrator

Boeing Information & Support Services

P.O. Box 24346, M/S 7A-33

Seattle, Washington 98124-0346



RE:  GT STRUDL



Dear Sir or Madam:



Enclosed please find copies of GTSTRUDL PROGRAM REPORT FORM 98.01, and a

GTSTRUDL QA CUSTOMER ACKNOWLEDGEMENT FORM.  Please sign and return the

GTSTRUDL QA CUSTOMER ACKNOWLEDGEMENT FORM to acknowledge receipt of the

GTSTRUDL Program Report.



Thank you for reviewing the Program Report and for returning the

Acknowledgement Form.



Best regards,

CASE Center





David C. Key

Configuration Control Manager



Enclosures



Computer Aided Structural Engineering Center        Phone: (404) 894-2260

School of Civil & Environmental Engineering           Fax: (404) 894-8014

Atlanta, Georgia 30332-0355 USA                       casec@ce.gatech.edu

               A Unit of the University System of Georgia





                      GTSTRUDL Program Report Form



                                                       GPRF No.: 98.01



                                                           DATE:



FROM:     Computer-Aided Structural Engineering Center

          Georgia Institute of Technology

          Atlanta, Georgia 30332-0355



SEVERITY LEVEL:



X    URGENT         Problem results in incorrect answers which may not be

                    apparent or job aborts and cannot be recovered within

                    the session or job.



_    SERIOUS        Problem results in incorrect answers which are

                    obvious or problem prevents completion of a

                    particular user's task.





_    MINOR          Problem can be worked around or problem poses high

                    frustration factor.



_    INFORMATIVE    Documentation error, program usage tip, user

                    inconveniences.





Date Problem Confirmed  January 12, 1998



Date Notification Sent



Computers  PC (DOS,NT,95), VAX,SUN,HP,RS



Operating System  see "Computers" above



Version 93.01, 94.01, 96.01, 97.01



Target Release for Correction  1998.2





                                   Mgr. ASD

Signature                          Title

R & D Division



Michael H. Swanger

Typed or Printed Name              Date of Signature





Signature                          Title

Professional Services Division





Typed or Printed Name              Date of Signature





Rev. 2.2





                      GTSTRUDL Program Report Form

                               (Continued)



                                                       GPRF No.:



                                                           DATE:



DESCRIPTION:



     The COMPUTE GROSS RESULTS command will abort if joint displacements

have not been previously computed by the COMPUTE ALL DISPLACEMENTS

command.  This will occur in the offshore analysis and design pile-

structure interaction analysis if the super element used to create the

stiffness matrix at the pile-structure boundary joints does not contain

all the active members in the structure.  The super element must contain

all active members/elements in the structure and the set of active

members/elements may not be changed prior to giving the COMPUTE GROSS

RESULTS command subsequent to the pile analysis.



GTSTRUDL User Reference Manual Sections:



  ACTIVE/INACTIVE Structure Specification    Section 2.1.3.4, Volume 1,

                                             Rev. D

  The Split Solver Commands for Static       Section 2.1.13.3, Volume 1,

  Analysis                                   Rev. P

  Guidelines for Pile-Structure Analysis     Section 6.7, Volume 8, Rev.

                                             M



Rev. 2.2





*** END OF DOCUMENT ***