Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Part 21 Report - 1997-760

LICENSEE: FOXBORO COMPANY SITE: FOXBORO COMPANY EN NUMBER:33081 DOCKET: EVENT DATE: 10-14-97 RX TYPE: EVENT TIME: 00:00 VENDORS: NOTIFY DATE: 10-14-97 EMERGENCY CLASS: N/A REGION: 1 STATE: MA TIME: 11:36 OPS OFFICER: STEVE SANDIN 10 CFR SECTION: CCCC 21.21 UNSPECIFIED PARAGRAPH PART 21 NOTIFICATION FOXBORO COMPANY LOCATED IN FOXBORO, MA. SUPPLIED A TOTAL OF SIX NUCLEAR QUALIFIED PRESSURE TRANSMITTERS CONTAINING THE INCORRECT ELECTRONIC MODULES. THE ELECTRONIC MODULES, ALTHOUGH FROM THE SAME FAMILY, WERE NOT SEISMICALLY QUALIFIED AS SPECIFIED ON THE PURCHASE ORDERS. THESE SIX UNITS WERE SUPPLIED TO: QTY: 5 MODEL # N-823DP-D3SH1 SHIPPED: 7/26/96 INSTALLED AT VERMONT YANKEE QTY: 1 MODEL # N-823DP-D3SH2-F SHIPPED: 3/11/97 INSTALLED AT INDIAN POINT 2 ALSO, THE PURCHASE ORDER FROM INDIAN POINT 2 SPECIFIED A CUMULATIVE EXPOSURE OF 6,000 RADS FOR SERVICE LIFE CONSIDERATION. FOXBORO DETERMINED THAT, THROUGH AN OVERSIGHT ON THEIR PART, THIS REQUIREMENT HAD NOT BEEN TAKEN INTO CONSIDERATION. FOXBORO HAS BEEN IN CONTACT WITH BOTH UTILITIES. AT THIS TIME, NEITHER UTILITY HAS INDICATED AN OPERABILITY CONCERN FOR THESE INSTALLED PRESSURE TRANSMITTERS. FOXBORO WILL FORMALIZE AND SUBMIT A WRITTEN REPORT.

Page Last Reviewed/Updated Wednesday, March 24, 2021

Page Last Reviewed/Updated Wednesday, March 24, 2021