Part 21 Report - 1995-116
COOPER ENERGY SERVICES 28710 04-21-95 OTH LICENSEE: COOPER ENERGY SERVICES SITE: .COOPER ENERGY SERVICES . EN NUMBER:28710 DOCKET: EVENT DATE: 04-21-95 RX TYPE: EVENT TIME: 13:02 VENDORS: NOTIFY DATE: 04-21-95 EMERGENCY CLASS: N/A REGION: 1 STATE: PA TIME: 13:02 OPS OFFICER: JOSEPH SEBROSKY 10 CFR SECTION: CCCC 21.21 UNSPECIFIED PARAGRAPH COOPER ENERGY SERVICES OF GROVE CITY, PA IS ISSUING A 10 CFR PART 21 REPORT DUE TO A POTENTIAL DESIGN DEFECT OF THE KSV EMERGENCY DIESEL GENERATOR (EDG) SYSTEM. THE PROBLEM WAS FIRST REPORTED AT NINE MILE POINT UNIT 2 AND CONCERNS A POTENTIAL DEFECT WITH THE COOLING WATER SYSTEM FOR THE MECHANICAL GOVERNOR. ON JANUARY 29, 1995 UNIT 2 EXPERIENCED A GOVERNOR FAILURE OF THE DIVISION 1 EDG DUE TO OVERHEATING OF THE GOVERNOR. TESTING OF THE FAILED MECHANICAL GOVERNOR REVEALED THAT THE ROOT CAUSE OF THE FAILURES WAS: 1) A LOW OR NO FLOW CONDITION DURING LOW COOLING WATER FLOW CONDITIONS, 2) TOO SMALL AND/OR LONG WATER TUBING RUNS, 3) LOW DIFFERENTIAL PRESSURE ACROSS THE INTERCOOLERS (THE SOURCE OF COOLING WATER FOR THE GOVERNOR COOLING SYSTEM). THE COOLING SYSTEM FOR THE MECHANICAL GOVERNOR WAS DESIGNED AND SUPPLIED BY COOPER-BESSEMER. THE PLANTS THAT ARE AFFECTED ARE NINE MILE POINT UNIT 2, AND BYRON UNITS 1 AND 2.
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021