PRIORITY ATTENTION REQUIRED MORNING REPORT - REGION III JUNE 28, 2000
Licensee/Facility: Notification:
American Electric Power MR Number: 3-00-0031
Cook 2 Date: 06/28/00
Bridgman,Michigan
Dockets: 50-316
PWR/W-4-LP
Subject: COMPLETION OF CONTINUOUS NRC INSPECTION OF D.C. COOK UNIT 2
RESTART ACTIVITIES
Discussion:
On June 28, 2000, at approximately 2:00 a.m. (EDT), continuous inspection
of D.C. Cook Unit 2 restart activities by NRC inspectors was completed
based upon adequate plant and licensee staff performance and plant
conditions meeting the pre-established termination criteria. Continuous
inspection was provided until the plant reached 50 percent power and was
operating with both main feedwater pumps running in automatic control.
NRC inspectors began continuous inspection approximately two weeks ago as
the licensee was preparing the Unit 2 reactor for restart. NRC inspectors
observed all of the major evolutions, including approach to criticality,
low power testing, and power ascension. The licensee encountered no
significant equipment problems during restart and power ascension. Unit 2
is currently approaching the next major hold point at 88 percent reactor
power for testing and monitoring of plant equipment.
Regional Action:
Information Only
Contact: ANTON VEGEL (630)829-9620