Morning Report for December 10, 1999
Headquarters Daily Report DECEMBER 10, 1999 *************************************************************************** REPORT NEGATIVE NO INPUT ATTACHED INPUT RECEIVED RECEIVED HEADQUARTERS X REGION I X REGION II X REGION III X REGION IV X PRIORITY ATTENTION REQUIRED MORNING REPORT - REGION III DEC. 10, 1999 Licensee/Facility: Notification: Wisconsin Electric Power Co. MR Number: 3-99-0100 Point Beach 1 Date: 12/10/99 Two Rivers,Wisconsin phone call from resident inspectors Dockets: 50-266 PWR/W-2-LP Subject: Completion of Unit 1 Refueling Outage Discussion: Friday morning, December 10, 1999, the licensee connected the main turbine- generator to the offsite electrical distribution grid, ending the Unit 1, cycle 25 refueling outage. Major work completed during the outage included modifications to the safety- related service water system and to the reactor cavity drain barrel, replacement of the B train reactor coolant pump motor, loading of the Unit's first 18-month core, and maintenance on safety-related electrical buses. The outage, which was originally scheduled for 44 days, was completed in 56 days. Much of the extension in duration was for the repair of emergent equipment problems identified during pre-startup testing. Regional Action: The resident inspectors observed startup activities. No significant problems were identified Contact: Roger Lanksbury, RDL (630)829-9631 _
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021