REPORT NEGATIVE NO INPUT
ATTACHED INPUT RECEIVED RECEIVED
HEADQUARTERS X
REGION I X
REGION II X
REGION III X
REGION IV X
PRIORITY ATTENTION REQUIRED MORNING REPORT - REGION I JULY 20, 1999
Licensee/Facility: Notification:
Duquesne Light Co. MR Number: 1-99-0023
Beaver Valley 2 Date: 07/20/99
Shippingport,Pennsylvania SRI/PC
Dockets: 50-412
PWR/W-3-LP
Subject: BEAVER VALLEY UNIT 2 FORCED OUTAGE - UPDATE
Reportable Event Number: 35930
Discussion:
On July 20, 1999, Region I dispatched a team of inspectors to the Beaver
Valley Unit 2 plant to perform a special inspection of the events
surrounding the loss of an emergency bus on July 16, 1999. The loss of
the emergency bus resulted in the loss of reactor coolant pump seal
injection flow and the loss of reactor coolant pump thermal barrier
cooling flow to two of the pumps for about 3 minutes. The special
inspection team will review the circumstances concerning the loss of the
emergency bus, and the actions taken by the operators. The team will also
evaluate other equipment problems which occurred prior to, during, and
after the loss of the emergency bus, and during the subsequent plant
shutdown.
Regional Action:
The resident inspectors are on site monitoring licensee activities.
Contact: N. Perry (610)337-5225
D. Kern (724)643-2000