Event Notification Report for November 16, 2026
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
11/15/2026 - 11/16/2026
EVENT NUMBERS
585115852458530585315853558536
Agreement State
Event Number: 58511
Rep Org: Arkansas Department of Health
Licensee: NEA Baptist Memorial Hospital
Region: 4
City: Jonesboro State: AR
County:
License #: ARK-1062-02220
Agreement: Y
Docket:
NRC Notified By: Hunter Broadaway
HQ OPS Officer: Christopher Prescott
Licensee: NEA Baptist Memorial Hospital
Region: 4
City: Jonesboro State: AR
County:
License #: ARK-1062-02220
Agreement: Y
Docket:
NRC Notified By: Hunter Broadaway
HQ OPS Officer: Christopher Prescott
Notification Date: 10/30/2026
Notification Time: 12:42 [ET]
Event Date: 10/27/2026
Event Time: 08:30 [CDT]
Last Update Date: 11/13/2026
Notification Time: 12:42 [ET]
Event Date: 10/27/2026
Event Time: 08:30 [CDT]
Last Update Date: 11/13/2026
Emergency Class: Non Emergency
10 CFR Section:
Agreement State
10 CFR Section:
Agreement State
Person (Organization):
NMSS_EVENTS_NOTIFICATION (EMAIL)
Daniel DiMarco (NMSS)
NMSS_EVENTS_NOTIFICATION (EMAIL)
Daniel DiMarco (NMSS)
EN Revision Imported Date: 11/16/2026
EN Revision Text: AGREEMENT STATE REPORT - MEDICAL EVENT
The following information was received from the Arkansas Department of Health (the Department) via email:
"On October 29, 2026, the Department received a notification regarding NEA Baptist Memorial Hospital.
"The event occurred on October 27, 2026, at 0830 CDT. A patient was given 27 mCi of Tc-99m Sestamibi intravenously for a parathyroid image. Two days later, on October 29, 2026, the provider that ordered the exam called to question the radiologist report. Upon further investigation, the written order was for a thyroid uptake scan. It was determined that the patient had received a misadministration under 10 CFR 35.3045, wrong radionuclide use. The Department is reporting the notification of this event to the NRC under SA-300 procedures. A written report was given to the Department on October 29, 2026. The licensee has initiated retraining of nuclear medicine staff regarding order verification and notes that training has been completed. The Department will note these future preventative measurements and verify documentation on the next inspection.
"No immediate adverse health effects are expected.
"Details on the cause of the event occurrence were not included in the written report provided to the Department and will be determined through further investigation."
* * * UPDATE ON 11/13/2026 AT 1248 EST FROM HUNTER BROADAWAY TO ADAM CONKLIN * * *
The following information was received from the Arkansas Department of Health (the Department) via email:
"Specific details of the misadministration occurring was due to an error in code input for ordering (IMG2509 vs IMG2519). The technologist then forgot to validate that the written order matched the EMR [Electronic Medical Record]. Landauer dose report calculates the effective dose to be 14.9 mSv, with a maximum organ dose of 49.9 mGy. These calculations were comparable to Department calculations.
"The Department considers event AR-2026-008 closed."
Notified NMSS Events Notifications email.
Arkansas event: AR-2026-08
A Medical Event may indicate potential problems in a medical facility's use of radioactive materials. It does not necessarily result in harm to the patient.
EN Revision Text: AGREEMENT STATE REPORT - MEDICAL EVENT
The following information was received from the Arkansas Department of Health (the Department) via email:
"On October 29, 2026, the Department received a notification regarding NEA Baptist Memorial Hospital.
"The event occurred on October 27, 2026, at 0830 CDT. A patient was given 27 mCi of Tc-99m Sestamibi intravenously for a parathyroid image. Two days later, on October 29, 2026, the provider that ordered the exam called to question the radiologist report. Upon further investigation, the written order was for a thyroid uptake scan. It was determined that the patient had received a misadministration under 10 CFR 35.3045, wrong radionuclide use. The Department is reporting the notification of this event to the NRC under SA-300 procedures. A written report was given to the Department on October 29, 2026. The licensee has initiated retraining of nuclear medicine staff regarding order verification and notes that training has been completed. The Department will note these future preventative measurements and verify documentation on the next inspection.
"No immediate adverse health effects are expected.
"Details on the cause of the event occurrence were not included in the written report provided to the Department and will be determined through further investigation."
* * * UPDATE ON 11/13/2026 AT 1248 EST FROM HUNTER BROADAWAY TO ADAM CONKLIN * * *
The following information was received from the Arkansas Department of Health (the Department) via email:
"Specific details of the misadministration occurring was due to an error in code input for ordering (IMG2509 vs IMG2519). The technologist then forgot to validate that the written order matched the EMR [Electronic Medical Record]. Landauer dose report calculates the effective dose to be 14.9 mSv, with a maximum organ dose of 49.9 mGy. These calculations were comparable to Department calculations.
"The Department considers event AR-2026-008 closed."
Notified NMSS Events Notifications email.
Arkansas event: AR-2026-08
A Medical Event may indicate potential problems in a medical facility's use of radioactive materials. It does not necessarily result in harm to the patient.
Agreement State
Event Number: 58524
Rep Org: Oregon Health Authority
Licensee: Oregon Health and Science Univ
Region: 4
City: Portland State: OR
County:
License #: ORE-90013
Agreement: Y
Docket:
NRC Notified By: Hillary Haskins
HQ OPS Officer: Robert A. Thompson
Licensee: Oregon Health and Science Univ
Region: 4
City: Portland State: OR
County:
License #: ORE-90013
Agreement: Y
Docket:
NRC Notified By: Hillary Haskins
HQ OPS Officer: Robert A. Thompson
Notification Date: 11/06/2026
Notification Time: 18:59 [ET]
Event Date: 11/03/2026
Event Time: 13:18 [PST]
Last Update Date: 11/06/2026
Notification Time: 18:59 [ET]
Event Date: 11/03/2026
Event Time: 13:18 [PST]
Last Update Date: 11/06/2026
Emergency Class: Non Emergency
10 CFR Section:
Agreement State
10 CFR Section:
Agreement State
Person (Organization):
NMSS_EVENTS_NOTIFICATION (EMAIL)
Whited, Jeffrey (IR MOC)
Christian Einberg (NMSS)
NMSS_EVENTS_NOTIFICATION (EMAIL)
Whited, Jeffrey (IR MOC)
Christian Einberg (NMSS)
AGREEMENT STATE REPORT - CONTAMINATION EVENT
The following is a summary of information provided by the Oregon Health Authority (the Authority) via phone and email:
On November 2, 2026, a patient was administered a 311 microcurie actinium-225 DOTATATE treatment with instructions to collect all urine specimens for 24 hours. When the patient returned to the licensee on November 3, 2026, with the collected specimen, a portion of the specimen was spilled in the licensee's parking garage. Radiation safety personnel promptly responded and identified a 4 mrem/h contact dose rate and removable contamination in the spill area. Immediate remediation efforts included collecting and storing loose contaminated debris in the area, placing absorbent material over the spill area and spill socks around the area, and covering contaminated areas with rigid plastic. The area was posted and secured. A survey after the initial remediation efforts were complete found the contact dose rate lowered to 1.5 mrem/h, with a dose rate of 0.2 mrem/h at 1 meter. Dose rates and contamination levels at the boundary were at background levels.
From evaluation of the remaining specimen, the licensee estimates that approximately 5 microcuries of Ac-225 were released.
The area remains secured pending final remediation and confirmatory surveys. No personnel contamination was identified. Surveys continue to show the contamination remains localized to the original spill location.
Oregon docket: 26-0065
The following is a summary of information provided by the Oregon Health Authority (the Authority) via phone and email:
On November 2, 2026, a patient was administered a 311 microcurie actinium-225 DOTATATE treatment with instructions to collect all urine specimens for 24 hours. When the patient returned to the licensee on November 3, 2026, with the collected specimen, a portion of the specimen was spilled in the licensee's parking garage. Radiation safety personnel promptly responded and identified a 4 mrem/h contact dose rate and removable contamination in the spill area. Immediate remediation efforts included collecting and storing loose contaminated debris in the area, placing absorbent material over the spill area and spill socks around the area, and covering contaminated areas with rigid plastic. The area was posted and secured. A survey after the initial remediation efforts were complete found the contact dose rate lowered to 1.5 mrem/h, with a dose rate of 0.2 mrem/h at 1 meter. Dose rates and contamination levels at the boundary were at background levels.
From evaluation of the remaining specimen, the licensee estimates that approximately 5 microcuries of Ac-225 were released.
The area remains secured pending final remediation and confirmatory surveys. No personnel contamination was identified. Surveys continue to show the contamination remains localized to the original spill location.
Oregon docket: 26-0065
Power Reactor
Event Number: 58530
Facility: Browns Ferry
Region: 2 State: AL
Unit: [1] [2] [3]
RX Type: [1] GE-4,[2] GE-4,[3] GE-4
NRC Notified By: Clayton Haney
HQ OPS Officer: Ernest West
Region: 2 State: AL
Unit: [1] [2] [3]
RX Type: [1] GE-4,[2] GE-4,[3] GE-4
NRC Notified By: Clayton Haney
HQ OPS Officer: Ernest West
Notification Date: 11/12/2026
Notification Time: 17:28 [ET]
Event Date: 11/12/2026
Event Time: 11:13 [CST]
Last Update Date: 11/12/2026
Notification Time: 17:28 [ET]
Event Date: 11/12/2026
Event Time: 11:13 [CST]
Last Update Date: 11/12/2026
Emergency Class: Non Emergency
10 CFR Section:
26.719 - Fitness For Duty
10 CFR Section:
26.719 - Fitness For Duty
Person (Organization):
R2 Reactor Event (EMAIL)
FFD Group, (EMAIL)
R2 Reactor Event (EMAIL)
FFD Group, (EMAIL)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
| 3 | N | Y | 100 | Power Operation | 100 | Power Operation |
FITNESS FOR DUTY
The following information was provided by the licensee via phone and fax:
"On November 12, 2026, at 1113 CST, it was determined that a licensed operator failed a test specified by the fitness for duty (FFD) testing program. The individual's authorization for site access has been terminated at all Tennessee Valley Authority facilities.
"The NRC Resident Inspector has been notified."
The following information was provided by the licensee via phone and fax:
"On November 12, 2026, at 1113 CST, it was determined that a licensed operator failed a test specified by the fitness for duty (FFD) testing program. The individual's authorization for site access has been terminated at all Tennessee Valley Authority facilities.
"The NRC Resident Inspector has been notified."
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
Power Reactor
Event Number: 58531
Facility: Watts Bar
Region: 2 State: TN
Unit: [2] [] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: Chris Roney
HQ OPS Officer: Josue Ramirez
Region: 2 State: TN
Unit: [2] [] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: Chris Roney
HQ OPS Officer: Josue Ramirez
Notification Date: 11/13/2026
Notification Time: 09:40 [ET]
Event Date: 11/13/2026
Event Time: 01:41 [EST]
Last Update Date: 11/15/2026
Notification Time: 09:40 [ET]
Event Date: 11/13/2026
Event Time: 01:41 [EST]
Last Update Date: 11/15/2026
Emergency Class: Non Emergency
10 CFR Section:
50.72(b)(3)(ii)(A) - Degraded Condition
10 CFR Section:
50.72(b)(3)(ii)(A) - Degraded Condition
Person (Organization):
R2 Reactor Event (Email)
R2 Reactor Event (Email)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 2 | N | N | 0 | Refueling | 0 | Refueling |
DEGRADED CONDITION
The following information was provided by the licensee via phone and email:
"The reactor coolant system (RCS) pressure boundary is degraded; this was identified during mode 6 reactor pressure vessel (RPV) head inspections.
"At 0141 EST on November 13, 2026, it was determined that the Watts Bar Nuclear Plant Unit 2 RCS boundary at the control rod drive mechanism (CRDM) penetration number '22' was degraded due to indications of boric acid on the RPV head. This pressure boundary leakage does not meet the acceptance criteria of American Society of Mechanical Engineers (ASME) section XI. This condition will be resolved prior to Unit 2 RPV reassembly and entry to mode 5.
"This report is being made as an eight (8) hour non-emergency notification per 10 CFR 50.72(b)(3)(ii)(A). There was no impact to the health and safety of the public or plant personnel.
"The NRC Resident Inspector has been notified."
* * * RETRACTION ON 11/15/2026 AT 1229 EST FROM CHRIS RONEY TO SEBASTIEN BRUNEAU * * *
The following information was provided by the licensee via phone and email:
"In accordance with NUREG-1022, Section 2.8 and Section 4.2.3, [Watts Bar Nuclear] is retracting the previous report in EN# 58531 pursuant to 10 CFR 50.72(b)(3)(ii)(A).
"During Unit 2 RPV inspections, the leakage described above was later determined to be coming from a CRDM plug above the penetration number '22'. This plug leakage traveled along the CRDM housing and accumulated around penetration number '22'. Access to the leakage path was not observed during the initial inspection due to limited access. Based on this information, the acceptance criteria was met for ASME section XI."
Notified R2 Reactor Event (email)
The following information was provided by the licensee via phone and email:
"The reactor coolant system (RCS) pressure boundary is degraded; this was identified during mode 6 reactor pressure vessel (RPV) head inspections.
"At 0141 EST on November 13, 2026, it was determined that the Watts Bar Nuclear Plant Unit 2 RCS boundary at the control rod drive mechanism (CRDM) penetration number '22' was degraded due to indications of boric acid on the RPV head. This pressure boundary leakage does not meet the acceptance criteria of American Society of Mechanical Engineers (ASME) section XI. This condition will be resolved prior to Unit 2 RPV reassembly and entry to mode 5.
"This report is being made as an eight (8) hour non-emergency notification per 10 CFR 50.72(b)(3)(ii)(A). There was no impact to the health and safety of the public or plant personnel.
"The NRC Resident Inspector has been notified."
* * * RETRACTION ON 11/15/2026 AT 1229 EST FROM CHRIS RONEY TO SEBASTIEN BRUNEAU * * *
The following information was provided by the licensee via phone and email:
"In accordance with NUREG-1022, Section 2.8 and Section 4.2.3, [Watts Bar Nuclear] is retracting the previous report in EN# 58531 pursuant to 10 CFR 50.72(b)(3)(ii)(A).
"During Unit 2 RPV inspections, the leakage described above was later determined to be coming from a CRDM plug above the penetration number '22'. This plug leakage traveled along the CRDM housing and accumulated around penetration number '22'. Access to the leakage path was not observed during the initial inspection due to limited access. Based on this information, the acceptance criteria was met for ASME section XI."
Notified R2 Reactor Event (email)
Non-Power Reactor
Event Number: 58535
Rep Org: Washington State University (WASU)
Licensee: Washington State University
Region: 0
City: Pullman State: WA
County: Whitman
License #: R-76
Agreement: Y
Docket: 05000027
NRC Notified By: Corey Hines
HQ OPS Officer: Ian Howard
Licensee: Washington State University
Region: 0
City: Pullman State: WA
County: Whitman
License #: R-76
Agreement: Y
Docket: 05000027
NRC Notified By: Corey Hines
HQ OPS Officer: Ian Howard
Notification Date: 11/13/2026
Notification Time: 18:04 [ET]
Event Date: 11/13/2026
Event Time: 11:05 [PST]
Last Update Date: 11/13/2026
Notification Time: 18:04 [ET]
Event Date: 11/13/2026
Event Time: 11:05 [PST]
Last Update Date: 11/13/2026
Emergency Class: Non Emergency
10 CFR Section:
10 CFR Section:
Person (Organization):
Gallagher, Brooke (NRR PM)
NPR Event Notification (Email)
Hardesty, Duane (NPUFB BC)
Gallagher, Brooke (NRR PM)
NPR Event Notification (Email)
Hardesty, Duane (NPUFB BC)
TECHNICAL SPECIFICATION VIOLATION
The following information was provided by the licensee via phone and email:
"This [event was] an apparent violation of section 3.1.2 of the Technical Specifications (TS) and Bases for the Washington State University Modified Training, Research, Isotopes, General Atomics (TRIGA) Reactor that occurred at approximately [1105 PST] on November 13, 2026.
"TS 3.1.2 states that the maximum reactivity inserted during pulse mode operation shall be such that the peak fuel temperature in any fuel rod does not exceed 830 degrees Celsius. During pulsing operations, a senior reactor operator (SRO) was preparing a pulse reactivity insertion of $1.85 into the reactor core to obtain data required to meet TS 4.1.2 for maximum reactivity insertion calculations. The SRO inadvertently obtained control element reactivity worth calculations from control element (CE) '4' data instead of the reactivity data from the correct control element (CE '3'). The resulted cylinder height was set at 9.13 inches instead of the cylinder height required for the pulse using CE '3' data, which would have been 7.25 inches, and the pulse rod was then ejected at the 9.13-inch cylinder height in order to initiate the pulse.
"The resulting pulse was in violation of the fuel rod temperature limiting condition for operation for pulsing, set at 830 degrees Celsius, and is thus a reportable occurrence to the U.S. NRC within 24 hours, with a follow-up report due in 10 days (TS 6.7). Initial calculations show that the safety limit was not exceeded (TS 2.1(2) and TS 2.1(2)) because the estimated peak temperature of the fuel reached approximately 870 degrees Celsius, which is below the safety limit of 1000 degrees Celsius for standard and 1150 degrees Celsius for 30/20 low enriched uranium fuel."
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:
The reactor scrammed due to the inserted pulse. At the time of the notification, the reactor was shut down. The estimated reactivity insertion from the pulse was $2.50.
The following information was provided by the licensee via phone and email:
"This [event was] an apparent violation of section 3.1.2 of the Technical Specifications (TS) and Bases for the Washington State University Modified Training, Research, Isotopes, General Atomics (TRIGA) Reactor that occurred at approximately [1105 PST] on November 13, 2026.
"TS 3.1.2 states that the maximum reactivity inserted during pulse mode operation shall be such that the peak fuel temperature in any fuel rod does not exceed 830 degrees Celsius. During pulsing operations, a senior reactor operator (SRO) was preparing a pulse reactivity insertion of $1.85 into the reactor core to obtain data required to meet TS 4.1.2 for maximum reactivity insertion calculations. The SRO inadvertently obtained control element reactivity worth calculations from control element (CE) '4' data instead of the reactivity data from the correct control element (CE '3'). The resulted cylinder height was set at 9.13 inches instead of the cylinder height required for the pulse using CE '3' data, which would have been 7.25 inches, and the pulse rod was then ejected at the 9.13-inch cylinder height in order to initiate the pulse.
"The resulting pulse was in violation of the fuel rod temperature limiting condition for operation for pulsing, set at 830 degrees Celsius, and is thus a reportable occurrence to the U.S. NRC within 24 hours, with a follow-up report due in 10 days (TS 6.7). Initial calculations show that the safety limit was not exceeded (TS 2.1(2) and TS 2.1(2)) because the estimated peak temperature of the fuel reached approximately 870 degrees Celsius, which is below the safety limit of 1000 degrees Celsius for standard and 1150 degrees Celsius for 30/20 low enriched uranium fuel."
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:
The reactor scrammed due to the inserted pulse. At the time of the notification, the reactor was shut down. The estimated reactivity insertion from the pulse was $2.50.
Independent Spent Fuel Storage Installation
Event Number: 58536
Rep Org: San Onofre
Licensee: Southern California Edison Company
Region: 4
City: San Clemente State: CA
County: San Diego
License #: GL
Agreement: Y
Docket: 72-41
NRC Notified By: Michael Kish
HQ OPS Officer: Ian Howard
Licensee: Southern California Edison Company
Region: 4
City: San Clemente State: CA
County: San Diego
License #: GL
Agreement: Y
Docket: 72-41
NRC Notified By: Michael Kish
HQ OPS Officer: Ian Howard
Notification Date: 11/13/2026
Notification Time: 18:46 [ET]
Event Date: 11/13/2026
Event Time: 14:26 [PST]
Last Update Date: 11/13/2026
Notification Time: 18:46 [ET]
Event Date: 11/13/2026
Event Time: 14:26 [PST]
Last Update Date: 11/13/2026
Emergency Class: Non Emergency
10 CFR Section:
50.72(b)(2)(xi) - Offsite Notification
10 CFR Section:
50.72(b)(2)(xi) - Offsite Notification
Person (Organization):
Anderson, Stephanie (R4BC)
Kostick, Aaron (NMSS)
NMSS_Events_Notification, (EMAIL)
Anderson, Stephanie (R4BC)
Kostick, Aaron (NMSS)
NMSS_Events_Notification, (EMAIL)
OFFSITE NOTIFICATION
The following information was provided by the licensee via phone and email:
"On November 13, 2026, from approximately 0800 to 0945 PST, an onsite civil contractor pumped approximately 10,800 gallons of ponded stormwater from a non-radiological work area (parking lot) into a nearby storm drain. The water had accumulated following an overnight storm and was removed to facilitate safe working conditions. The storm drain discharges to the beach and the Pacific Ocean.
"Due to an oversight, the water was not sampled prior to discharge. Once the error was recognized, an onsite qualified SWPPP [storm water pollution prevention plan] practitioner delegate sampled the discharge. The sample had a pH of 7.30, within the applicable numeric action level, and turbidity greater than 1,000 nephelometric turbidity units, exceeding the applicable turbidity numeric action level. The discharge was terminated following the sampling results. The discharge will not resume until appropriate corrective actions are implemented.
"On November 13, 2026, at 1426 PST, SONGS [San Onofre Nuclear Generating Station] notified the San Diego Regional Water Quality Control Board of the dewatering discharge in accordance with the 2022 Construction General Permit. This NRC notification is being made under 10 CFR 50.72(b)(2)(xi) based on the notification to an offsite government agency."
The following information was provided by the licensee via phone and email:
"On November 13, 2026, from approximately 0800 to 0945 PST, an onsite civil contractor pumped approximately 10,800 gallons of ponded stormwater from a non-radiological work area (parking lot) into a nearby storm drain. The water had accumulated following an overnight storm and was removed to facilitate safe working conditions. The storm drain discharges to the beach and the Pacific Ocean.
"Due to an oversight, the water was not sampled prior to discharge. Once the error was recognized, an onsite qualified SWPPP [storm water pollution prevention plan] practitioner delegate sampled the discharge. The sample had a pH of 7.30, within the applicable numeric action level, and turbidity greater than 1,000 nephelometric turbidity units, exceeding the applicable turbidity numeric action level. The discharge was terminated following the sampling results. The discharge will not resume until appropriate corrective actions are implemented.
"On November 13, 2026, at 1426 PST, SONGS [San Onofre Nuclear Generating Station] notified the San Diego Regional Water Quality Control Board of the dewatering discharge in accordance with the 2022 Construction General Permit. This NRC notification is being made under 10 CFR 50.72(b)(2)(xi) based on the notification to an offsite government agency."