Event Notification Report for May 24, 2024

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
05/23/2024 - 05/24/2024

EVENT NUMBERS
57136 57137 57138 57139 57140
Power Reactor
Event Number: 57136
Facility: Perry
Region: 3     State: OH
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: Darin Smith
HQ OPS Officer: Adam Koziol
Notification Date: 05/23/2024
Notification Time: 04:25 [ET]
Event Date: 05/23/2024
Event Time: 04:00 [EDT]
Last Update Date: 05/23/2024
Emergency Class: Non Emergency
10 CFR Section:
50.72(b)(2)(i) - Plant S/D Reqd By TS
Person (Organization):
Ziolkowski, Michael (R3DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 40 Power Operation 40 Power Operation
Event Text
TECHNICAL SPECIFICATION REQUIRED SHUTDOWN

The following information was provided by the licensee via email:

"At 0400 EDT on May 23, 2024, a technical specification required shutdown was initiated at Perry. Technical specification action 3.4.5 condition B [unidentified reactor coolant system leakage exceeds 5 gallons per minute] was entered on May 23, 2024 at 0000 with a required action to reduce leakage to within limits within 4 hours, due by 0400 on May 23, 2024. This required action was not completed within the completion time, therefore, a technical specification required shutdown was initiated, and this event is being reported as a four-hour, non-emergency notification per 10 CFR 50.72(b)(2)(i).

"There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified."

The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:

The reactor coolant leakage was stable at approximately 6 gallons per minute.


Power Reactor
Event Number: 57137
Facility: Arkansas Nuclear
Region: 4     State: AR
Unit: [1] [2] []
RX Type: [1] B&W-L-LP,[2] CE
NRC Notified By: John Giddens
HQ OPS Officer: John Lilliendahl
Notification Date: 05/23/2024
Notification Time: 11:24 [ET]
Event Date: 05/23/2024
Event Time: 07:51 [CDT]
Last Update Date: 05/23/2024
Emergency Class: Non Emergency
10 CFR Section:
26.719 - Fitness For Duty
Person (Organization):
Dixon, John (R4DO)
FFD Group, (EMAIL)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 38 Power Operation 38 Power Operation
2 N Y 100 Power Operation 100 Power Operation
Event Text
FITNESS FOR DUTY PROGRAMMATIC FAILURE

The following information was provided by the licensee via email:

"During a security inspection, it was determined that some past events at Entergy sites that were not reported may have met the reporting criterion of 10 CFR 26.719(b)(4). As a result, the following events at Arkansas Nuclear One, Units 1 and 2 are now being conservatively reported: On February 2, 2023, a condition report was written to document that an individual who should have been placed in a follow-up fitness for duty (FFD) program was not tested according to this program. On September 6, 2023, a subsequent condition report was written to document that a different individual who should have been placed in a follow-up FFD program was not tested according to this program. The resident inspector has been notified."


Power Reactor
Event Number: 57138
Facility: Grand Gulf
Region: 4     State: MS
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: John Giddens
HQ OPS Officer: John Lilliendahl
Notification Date: 05/23/2024
Notification Time: 11:24 [ET]
Event Date: 05/23/2024
Event Time: 07:51 [CDT]
Last Update Date: 05/23/2024
Emergency Class: Non Emergency
10 CFR Section:
26.719 - Fitness For Duty
Person (Organization):
Dixon, John (R4DO)
FFD Group, (EMAIL)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
FITNESS FOR DUTY PROGRAMMATIC FAILURE

The following information was provided by the licensee via email:

"During a security inspection, it was determined that some past events at Entergy sites that were not reported may have met the reporting criterion of 10 CFR 26.719(b)(4). As a result, the following event at Grand Gulf, Unit 1 is now being conservatively reported: On May 11, 2023, a condition report was written to document that an individual who should have been placed in a follow-up fitness for duty program was not tested according to this program. The resident inspector has been notified."


Power Reactor
Event Number: 57139
Facility: River Bend
Region: 4     State: LA
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: John Gibbens
HQ OPS Officer: John Lilliendahl
Notification Date: 05/23/2024
Notification Time: 11:24 [ET]
Event Date: 05/23/2024
Event Time: 07:51 [CDT]
Last Update Date: 05/23/2024
Emergency Class: Non Emergency
10 CFR Section:
26.719 - Fitness For Duty
Person (Organization):
Dixon, John (R4DO)
FFD Group, (EMAIL)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
FITNESS FOR DUTY PROGRAMMATIC FAILURE

The following information was provided by the licensee via email:

"During a security inspection, it was determined that some past events at Entergy sites that were not reported may have met the reporting criterion of 10 CFR 26.719(b)(4). As a result, the following events at River Bend Station, Unit 1 are now being conservatively reported: On March 21, 2023, a condition report was written to document that an individual who should have been placed in a follow-up fitness for duty (FFD) program was not tested according to this program. On May 11, 2023, a subsequent condition report was written to document that a different individual who should have been placed in a follow-up FFD program was not tested according to this program. The resident inspector has been notified."


Power Reactor
Event Number: 57140
Facility: Waterford
Region: 4     State: LA
Unit: [3] [] []
RX Type: [3] CE
NRC Notified By: John Gibbens
HQ OPS Officer: John Lilliendahl
Notification Date: 05/23/2024
Notification Time: 11:24 [ET]
Event Date: 05/23/2024
Event Time: 07:51 [CDT]
Last Update Date: 05/23/2024
Emergency Class: Non Emergency
10 CFR Section:
26.719 - Fitness For Duty
Person (Organization):
Dixon, John (R4DO)
FFD Group, (EMAIL)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
3 N Y 52 Power Operation 52 Power Operation
Event Text
FITNESS FOR DUTY PROGRAMMATIC FAILURE

The following information was provided by the licensee via email:

"During a security inspection, it was determined that some past events at Entergy sites that were not reported may have met the reporting criterion of 10 CFR 26.719(b)(4). As a result, the following event at Waterford Steam Electric Station, Unit 3 is now being conservatively reported: On May 15, 2023, a condition report was written to document that an individual who should have been placed in a follow-up fitness for duty program was not tested according to this program. The individual was no longer badged at Waterford 3 but is currently badged at another Entergy site. The resident inspector has been notified."