United States Nuclear Regulatory Commission - Protecting People and the Environment
Home > NRC Library > Document Collections > Reports Associated with Events > Event Notification Reports > 2020 > July 06

Event Notification Report for July 06, 2020

U.S. Nuclear Regulatory Commission
Operations Center

Event Reports For
7/3/2020 - 7/6/2020

** EVENT NUMBERS **


54762

To top of page
Power Reactor Event Number: 54762
Facility: Turkey Point
Region: 2     State: FL
Unit: [] [4] []
RX Type: [3] W-3-LP,[4] W-3-LP
NRC Notified By: Arturo Alvarez
HQ OPS Officer: Jeffrey Whited
Notification Date: 07/05/2020
Notification Time: 23:05 [ET]
Event Date: 07/05/2020
Event Time: 21:09 [EDT]
Last Update Date: 07/05/2020
Emergency Class: Non Emergency
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS Actuation - Critical
Person (Organization):
MARK MILLER (R2DO)
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
4 A/R Y 100 Power Operation 0 Hot Standby

Event Text

REACTOR TRIP DUE TO TURBINE TRIP

"Reactor trip caused by turbine trip due to voltage regulator issues. Plant is stable. Exited the Emergency Operating Procedure Network."

Auxiliary Feedwater automatically actuated and was subsequently restored to standby.

The licensee notified the NRC Resident Inspector.


Page Last Reviewed/Updated Monday, July 06, 2020
Monday, July 06, 2020