Skip to main content

Event Notification Report for October 06, 2017

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
10/05/2017 - 10/06/2017

EVENT NUMBERS
53007530025300353083

Agreement State
Event Number: 53007
Rep Org: PA BUREAU OF RADIATION PROTECTION
Licensee: U.S. STEEL CORPORATION - EDGAR THOMPSON PLANT
Region: 1
City: CLAIRTON   State: PA
County:
License #: PA-G0310
Agreement: Y
Docket:
NRC Notified By: JOE MELNIC
HQ OPS Officer: STEVE SANDIN
Notification Date: 10/10/2017
Notification Time: 10:35 [ET]
Event Date: 10/06/2017
Event Time: 00:00 [EDT]
Last Update Date: 10/10/2017
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
FRANK ARNER (R1DO)
NMSS_EVENTS_NOTIFICA (EMAI)
Event Text
AGREEMENT STATE REPORT - STUCK/BROKEN SHUTTERS ON TWO FIXED NUCLEAR GAUGES

The following information was received from the Commonwealth of Pennsylvania via email/fax:

"Event Description: The licensee reported that on October 6, 2017, while performing a lockout procedure for a major outage, the workers noted that two shutters were stuck in the open position. The shutters were both on Berthold Model LB7410 gauges and contained 300 milliCuries of americium-241 each. Both gauges are located in a pit area within major piping lines and a locked gate. This is an inaccessible area, thus no overexposures have occurred. Both units have been taken out of service and a service provider was contacted and has developed a plan to repair or replace the units if necessary.

"Cause of the Event: Equipment failure.

"ACTIONS: The Department [PA Bureau of Radiation Protection] will perform a reactive inspection. More information will be provided upon receipt.

"Event Report ID No: PA170015"


Part 21
Event Number: 53002
Rep Org: PARAGON ENERGY SOLUTIONS
Licensee: PARAGON ENERGY SOLUTIONS
Region: 1
City: OAK RIDGE   State: TN
County:
License #:
Agreement: Y
Docket:
NRC Notified By: RAY CHALIFOUX
HQ OPS Officer: DONALD NORWOOD
Notification Date: 10/06/2017
Notification Time: 15:29 [ET]
Event Date: 10/06/2017
Event Time: 00:00 [EDT]
Last Update Date: 11/29/2017
Emergency Class: NON EMERGENCY
10 CFR Section:
21.21(a)(2) - INTERIM EVAL OF DEVIATION
Person (Organization):
REBECCA NEASE (R2DO)
PART 21/50.55 REACTO (EMAI)
Event Text
PART 21 INTERIM REPORT - SWITCH WITH UNACCEPTABLE CHATTER

The following information is excerpted from a report received via email:

"Seismic qualification testing revealed contact block (CB) chatter greater than 2 milliseconds (msec) contrary to the acceptance requirements of the seismic test procedure developed for the activity. This switch has not been provided to the customer, however, a second suspect switch with a similar configuration and parts is installed in the customer's facility.

"The condition is isolated to when OT2A CBs are configured in an alternating Normally Open (NO) / Normally Closed or Normally Closed (NC) / Normally Open (NO) arrangement. The CBs do not exhibit chatter when 3 or less CBs are configured this way. The chatter is not exhibited when configured in a NO/NC, NO/NC, configuration. When the fourth CB is added to the switch assembly in an alternating configuration is when the contact chatter exceeds greater than 2 msec.

"Paragon Engineering has requested TVA Engineering to provide a reduced spectra specific to the installed location for further evaluation. Paragon Engineering has not been able to complete this activity within the 60-day period allowed under 10 CFR 21.

"One suspect switch has been provided to and installed at the customer's facility. The customer's facility is TVA - Watts Bar Unit 2."

* * * UPDATE ON 11/29/17 AT 1648 EST FROM RAY CHALIFOUX TO DAVID AIRD * * *

The following is an excerpt from the final Part 21 report received via email:

"Paragon ES [Energy Solutions] successfully completed qualification of a seismic specimen to the originally provided spectra using older vintage contact blocks. A reduced response spectra was requested from the licensee to verify that this condition did not present a substantial safety hazard for the existing installed switch.

"The licensee alternatively completed an evaluation of the condition and determined a substantial safety hazard did not exist."

Notified R2DO (Blamey) and Part 21 Reactors Group via email.


Power Reactor
Event Number: 53003
Facility: SUSQUEHANNA
Region: 1     State: PA
Unit: [1] [2] []
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: STEVE KOCH
HQ OPS Officer: DONALD NORWOOD
Notification Date: 10/06/2017
Notification Time: 21:46 [ET]
Event Date: 10/06/2017
Event Time: 19:45 [EDT]
Last Update Date: 10/06/2017
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
Person (Organization):
DON JACKSON (R1DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
2 N Y 100 Power Operation 100 Power Operation
Event Text
LOSS OF CONTROL ROOM HABITABILITY ENVELOPE

"On October 6, 2017 at 1945 EDT, a loss of Control Room Habitability Envelope (CRE) was declared due to failing to meet the requirements of SR 3.7.3.4 during 72 month surveillance testing. Measured in-leakage exceeded the SR acceptance value.

"The CRE is required to be maintained such that occupants can control the reactor safely under normal conditions and maintain it in a safe condition following a radiological event, hazardous chemical release, or a smoke challenge. The station remains in compliance with Technical Specification required action statements.

"This event is being reported under 10 CFR 50.72(b)(3)(v)(D) and per the guidance of NUREG 1022, Rev. 3, Section 3.2.7 as a loss of a Safety Function. There is no redundant Susquehanna Control Room Habitability Envelope."

The licensee notified the NRC Resident Inspector.


Power Reactor
Event Number: 53083
Facility: LASALLE
Region: 3     State: IL
Unit: [1] [] []
RX Type: [1] GE-5,[2] GE-5
NRC Notified By: MATTHEW MILLER
HQ OPS Officer: DAVID AIRD
Notification Date: 11/21/2017
Notification Time: 14:22 [ET]
Event Date: 10/06/2017
Event Time: 09:10 [CDT]
Last Update Date: 11/21/2017
Emergency Class: NON EMERGENCY
10 CFR Section:
50.73(a)(1) - INVALID SPECIF SYSTEM ACTUATION
Person (Organization):
LAURA KOZAK (R3DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
INVALID SPECIFIED SYSTEM ACTUATION

"On October 6, 2017 at 0910 CDT hours, with Unit 1 in Mode 1 (Power Operation), the 1A Diesel Generator Cooling Water Pump (DGCWP) automatically started. The cause was the misoperation of the 1B/C RHR [Residual Heat Removal] Room Cooler Fan (1VY03C) control switch, which was placed in the start position instead of the intended pull-to-lock position. The start of the 1VY03C fan resulted in the automatic actuation of the 1A DGCWP. This system actuation is reportable in accordance with 10CFR50.73(a)(2)(iv)(A). The invalid actuation was not part of a pre-planned sequence during testing or reactor operation.

"The 1A DGCWP, an emergency service water system that does not normally run and that serves as an ultimate heat sink, responded satisfactorily.

"This call is being made in accordance with 10CFR50.73(a)(1), which states that in the case of an invalid actuation reported under 10CFR50.73(a)(2)(iv), other than an actuation of the reactor protection system when the reactor is critical, the licensee may provide a telephone notification to the NRC Operations Center within 60 days after discovery of the event instead of submitting a written Licensee Event Report."

The licensee notified the NRC Resident Inspector.