The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for November 9, 2015

U.S. Nuclear Regulatory Commission
Operations Center

Event Reports For
11/06/2015 - 11/09/2015

** EVENT NUMBERS **


51518 51521

To top of page
Power Reactor Event Number: 51518
Facility: TURKEY POINT
Region: 2 State: FL
Unit: [3] [4] [ ]
RX Type: [3] W-3-LP,[4] W-3-LP
NRC Notified By: TIM JONES
HQ OPS Officer: JOHN SHOEMAKER
Notification Date: 11/06/2015
Notification Time: 14:08 [ET]
Event Date: 11/06/2015
Event Time: 11:38 [EST]
Last Update Date: 11/06/2015
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
Person (Organization):
BINOY DESAI (R2DO)

Unit SCRAM Code RX CRIT Initial PWR Initial RX Mode Current PWR Current RX Mode
3 N N 0 Defueled 0 Defueled
4 N Y 100 Power Operation 100 Power Operation

Event Text

OFFSITE NOTIFICATION DUE TO DECEASED AMERICAN CROCODILE

"This 4-hour Non-Emergency notification to the NRC is being made based on notifications to other government agencies per 10 CFR 50.72(b)(2)(xi).

"On November 6, 2015, at approximately 1138 EST, notification of a deceased American Crocodile discovered in the Owner Controlled Area was made to state and federal agencies. The crocodile's death was not caused by facility operations. The U.S. Fish and Wildlife Service, and the Florida Fish and Wildlife Conservation Commission were notified.

"The licensee notified the NRC Resident Inspector."

To top of page
Power Reactor Event Number: 51521
Facility: MILLSTONE
Region: 1 State: CT
Unit: [ ] [2] [ ]
RX Type: [1] GE-3,[2] CE,[3] W-4-LP
NRC Notified By: BARRETT NICHOLS
HQ OPS Officer: DONALD NORWOOD
Notification Date: 11/08/2015
Notification Time: 02:55 [ET]
Event Date: 11/08/2015
Event Time: 02:30 [EST]
Last Update Date: 11/08/2015
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL
Person (Organization):
JOHN ROGGE (R1DO)

Unit SCRAM Code RX CRIT Initial PWR Initial RX Mode Current PWR Current RX Mode
2 M/R Y 15 Power Operation 0 Hot Standby

Event Text

MANUAL REACTOR TRIP DUE TO REACTOR COOLANT PUMP OIL LEAK

During power ascension following refueling outage, a decreasing oil level in the 'C' Reactor Coolant Pump was noted. When the oil level reached 69 percent, with the reactor at approximately 56 percent rated thermal power, per plant procedure, a rapid downpower was initiated which brought the plant to approximately 15 percent power and a manual reactor trip was initiated at that point. The reactor trip was uncomplicated and all plant equipment responded as expected.

The licensee notified the NRC Resident Inspector.