Event Notification Report for April 18, 2002
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
04/17/2002 - 04/18/2002
EVENT NUMBERS
38863
Power Reactor
Event Number: 38863
Facility: SURRY
Region: 2 State: VA
Unit: [] [2] []
RX Type: [1] W-3-LP,[2] W-3-LP
NRC Notified By: ALLEN HARROW
HQ OPS Officer: LEIGH TROCINE
Region: 2 State: VA
Unit: [] [2] []
RX Type: [1] W-3-LP,[2] W-3-LP
NRC Notified By: ALLEN HARROW
HQ OPS Officer: LEIGH TROCINE
Notification Date: 04/18/2002
Notification Time: 21:04 [ET]
Event Date: 04/18/2002
Event Time: 17:35 [EDT]
Last Update Date: 04/18/2002
Notification Time: 21:04 [ET]
Event Date: 04/18/2002
Event Time: 17:35 [EDT]
Last Update Date: 04/18/2002
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
Person (Organization):
BRIAN BONSER (R2)
BRIAN BONSER (R2)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 2 | N | N | 0 | Hot Shutdown | 0 | Hot Shutdown |
OFFSITE NOTIFICATION REGARDING THE RESCUE OF TWO WORKERS FROM A MAN-BASKET THAT WAS SUPPORTED BY A DISABLED CRANE
The following text is a portion of a facsimile received from the licensee:
"At 1735 hours on 04/18/02, Coast Guard assistance was requested to remove two personnel from a man-basket that was supported by a disabled crane which had been performing ASME Section XI IWL Containment concrete inspections. The rescue was completed by helicopter at 1938 hours."
The licensee stated that Unit 2 is currently in Hot Shutdown after refueling and prior to going critical.
The licensee notified the NRC resident inspector.
The following text is a portion of a facsimile received from the licensee:
"At 1735 hours on 04/18/02, Coast Guard assistance was requested to remove two personnel from a man-basket that was supported by a disabled crane which had been performing ASME Section XI IWL Containment concrete inspections. The rescue was completed by helicopter at 1938 hours."
The licensee stated that Unit 2 is currently in Hot Shutdown after refueling and prior to going critical.
The licensee notified the NRC resident inspector.