Event Notification Report for August 23, 2000
U.S. Nuclear Regulatory Commission Operations Center Event Reports For 08/22/2000 - 08/23/2000 ** EVENT NUMBERS ** 37245 37246 37247 37248 +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 37245 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: FITZPATRICK REGION: 1 |NOTIFICATION DATE: 08/21/2000| | UNIT: [1] [] [] STATE: NY |NOTIFICATION TIME: 19:33[EDT]| | RXTYPE: [1] GE-4 |EVENT DATE: 08/21/2000| +------------------------------------------------+EVENT TIME: 18:00[EDT]| | NRC NOTIFIED BY: KERRY ALLEN |LAST UPDATE DATE: 08/22/2000| | HQ OPS OFFICER: DICK JOLLIFFE +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: N/A |CHRISTOPHER CAHILL R1 | |10 CFR SECTION: | | |APRE 50.72(b)(2)(vi) OFFSITE NOTIFICATION | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | OFFSITE NOTIFICATION REGARDING OIL SPILL ONSITE | | | | "Oil was discovered covering the gravel over an approximate 1 meter diameter | | area. The area was located under vent pipe for the main turbine generator | | air detraining tank on the turbine building roof." | | | | The NRC resident inspector will be notified by the licensee. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Other Nuclear Material |Event Number: 37246 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: WA DIVISION OF RADIATION PROTECTION |NOTIFICATION DATE: 08/22/2000| |LICENSEE: COLUMBIA ASPHALT & GRAVEL |NOTIFICATION TIME: 15:10[EDT]| | CITY: YAKIMA REGION: 4 |EVENT DATE: 08/19/2000| | COUNTY: STATE: WA |EVENT TIME: [PDT]| |LICENSE#: WN-10440-1 AGREEMENT: Y |LAST UPDATE DATE: 08/22/2000| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |WILLIAM JOHNSON R4 | | |JOSEPHINE PICCONE NMSS | +------------------------------------------------+ | | NRC NOTIFIED BY: TERRY FRAZEE | | | HQ OPS OFFICER: DICK JOLLIFFE | | +------------------------------------------------+ | |EMERGENCY CLASS: N/A | | |10 CFR SECTION: | | |NAGR AGREEMENT STATE | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | AGREEMENT STATE REPORT: LOST PORTABLE MOISTURE DENSITY GAUGE | | | | This notification of an event in Washington state as reported to the WA | | Department of Health, Division of Radiation Protection. (WA Event Report | | #WA-00-039) Date of event: August 19, 2000 | | | | Licensee: Columbia Asphalt & Gravel | | City and state: Yakima, WA | | License number: WN-10440-1 | | Type of license: Portable Gauge | | Location of Event: Toppenish, WA | | | | ABSTRACT: Tired and exhausted after a 60 hour work week, the gauge operator | | packed up and headed for home. The next morning when he went out to his | | van, parked in a secured lot, he discovered that the van was unlocked and | | the gauge transport box was open. The Campbell Pacific Model MC3 was | | missing. He called the police to report it stolen and called the Division's | | emergency number. The Division provided him instructions on issuing a press | | release and suggested offering a reward. The gauge operator also drove back | | to the job site to double check that he had not inadvertently left the gauge | | behind. No one was working at the site on August 20, 2000, and he did not | | find the gauge. | | | | On Monday, August 21, 2000, the gauge operator reported that the gauge had | | been returned to him by the "flaggers". One of the employees of the traffic | | control contractor at the site was familiar with portable gauges and | | realized that the gauge operator had inadvertently drove off without the | | gauge at the end of work on Saturday. The flagger secured the gauge and | | notified the gauge operator immediately at the start of the next workday. | | The gauge was returned safely and this case is closed for purposes of | | reporting to NRC. | | | | What is the notification or reporting criteria involved? WAC 246-221-240 | | Activity and isotope(s) involved: 10 millicuries Cs-137; 50 millicuries | | Am-24 1/Be | | Lost, Stolen or Damaged? Campbell Pacific, Model MC3, S/N M370803865 | | Disposition/recovery: Recovered Status: Closed | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |General Information or Other |Event Number: 37247 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: MIDWEST INSPECTION SERVICES |NOTIFICATION DATE: 08/22/2000| |LICENSEE: MIDWEST INSPECTION SERVICES |NOTIFICATION TIME: 17:30[EDT]| | CITY: OAK CITY REGION: 4 |EVENT DATE: 08/22/2000| | COUNTY: STATE: OK |EVENT TIME: 15:00[CDT]| |LICENSE#: 35-27005-01 AGREEMENT: N |LAST UPDATE DATE: 08/22/2000| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |WILLIAM JOHNSON R4 | | |JOSEPHINE PICCONE NMSS | +------------------------------------------------+ | | NRC NOTIFIED BY: DENNIS EZZELL | | | HQ OPS OFFICER: DICK JOLLIFFE | | +------------------------------------------------+ | |EMERGENCY CLASS: N/A | | |10 CFR SECTION: | | |BAD1 20.2202(a)(1) PERS OVEREXPOSURE | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | - FILM BADGE WITH HIGH READING FOR JULY, 2000 MAY HAVE BEEN TAMPERED WITH - | | | | On 07/24/00, an employee resigned from Midwest Inspection Services, Oak | | City, OK. The individual's film badge for the month of July, 2000, was sent | | to Landauer Company for processing. At 1500 CDT on 08/22/00, Landauer | | reported to Midwest Inspection Services that the badge read 710 Rem for the | | month of July, 2000. | | | | Mr Ezzell, Midwest Inspection Services, feels that the film badge reading is | | incorrect and that the badge may have been tampered with possibly by a | | disgruntled employee who also resigned from Midwest Inspection Services in | | July, 2000. Blood samples of the first individual will be taken on 08/23/00 | | and his red and white blood cells will be counted. | | | | Mr Ezzell notified NRC Region 4 Mark Shaffer and plans to continue to | | investigate this incident. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 37248 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: DUANE ARNOLD REGION: 3 |NOTIFICATION DATE: 08/23/2000| | UNIT: [1] [] [] STATE: IA |NOTIFICATION TIME: 05:14[EDT]| | RXTYPE: [1] GE-4 |EVENT DATE: 08/23/2000| +------------------------------------------------+EVENT TIME: 02:30[CDT]| | NRC NOTIFIED BY: MIKE HAUNER |LAST UPDATE DATE: 08/23/2000| | HQ OPS OFFICER: JOHN MacKINNON +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: N/A |PATRICK HILAND R3 | |10 CFR SECTION: | | |AIND 50.72(b)(2)(iii)(D) ACCIDENT MITIGATION | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | BOTH RIVER WATER SUPPLY SYSTEMS WERE DECLARED INOPERABLE. | | | | At 0230 the River Water Supply (RWS) instrument air system failed resulting | | in an invalid low RWS pit level alarm. Operators restored system air | | pressure at 0243. The loss of instrument air pressure also resulted in the | | loss of automatic traveling screen control and the screen high differential | | level alarm function. Because both of the automatic traveling screen wash | | systems were inoperable, both RWS systems were declared inoperable for the | | 13 minute duration. Failure of both systems resulted in a loss of safety | | function (supplies water to the Residual Heat Removal Service Water Pumps | | and the Emergency Service Water System). The licensee entered the applicable | | Technical Specifications for the loss of the RWS system. A new air dryer | | was installed recently and when the operator cycled the power supply to the | | air dryer it hung up. This caused the Instrument Air blockage. | | | | The NRC Resident Inspector was notified of this event by the licensee. | +------------------------------------------------------------------------------+
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021