The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for July 6, 2000

                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           07/05/2000 - 07/06/2000

                              ** EVENT NUMBERS **

37142  37143  37144  37145  37146  37147  

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   37142       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: CLINTON                  REGION:  3  |NOTIFICATION DATE: 07/05/2000|
|    UNIT:  [1] [] []                 STATE:  IL |NOTIFICATION TIME: 13:01[EDT]|
|   RXTYPE: [1] GE-6                             |EVENT DATE:        07/05/2000|
+------------------------------------------------+EVENT TIME:        11:05[CDT]|
| NRC NOTIFIED BY:  FUNKHOUSER                   |LAST UPDATE DATE:  07/05/2000|
|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |MICHAEL JORDAN       R3      |
|10 CFR SECTION:                                 |                             |
|AMED 50.72(b)(2)(v)      OFFSITE MEDICAL        |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| POTENTIALLY CONTAMINATED PERSON TRANSPORTED TO THE HOSPITAL                  |
|                                                                              |
| "On 7/5/00 at 1105, a potentially contaminated worker was taken offsite by   |
| ambulance to John Warner Hospital in Clinton, Illinois. The worker, an       |
| Electrician, was working on the Fuel Building bridge on 755' Fuel Building   |
| when he passed out.  The Electrician was working in a potentially            |
| contaminated area.  Radiation Protection personnel accompanied the           |
| electrician to the hospital but were not able to verify that he was not      |
| contaminated at the time he left site to be taken to the hospital. The       |
| electrician regained consciousness while on the Fuel Building bridge. At     |
| 1132, Radiation Protection personnel frisked the electrician at the hospital |
| and found no contamination on the individual or his clothing. This           |
| notification is being made pursuant to 10CFR50.72(b)(2)(v), Offsite          |
| Medical."                                                                    |
|                                                                              |
|                                                                              |
| The NRC Resident Inspector was notified.                                     |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   37143       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: COOK                     REGION:  3  |NOTIFICATION DATE: 07/05/2000|
|    UNIT:  [1] [2] []                STATE:  MI |NOTIFICATION TIME: 13:06[EDT]|
|   RXTYPE: [1] W-4-LP,[2] W-4-LP                |EVENT DATE:        07/05/2000|
+------------------------------------------------+EVENT TIME:        05:32[EDT]|
| NRC NOTIFIED BY:  COBB                         |LAST UPDATE DATE:  07/05/2000|
|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |MICHAEL JORDAN       R3      |
|10 CFR SECTION:                                 |                             |
|HFIT 26.73               FITNESS FOR DUTY       |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          N       0        Refueling        |0        Refueling        |
|2     N          Y       98       Power Operation  |98       Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| POSITIVE FOR-CAUSE ALCOHOL TEST                                              |
|                                                                              |
| A contractor supervisor tested positive for alcohol during a for-cause test  |
| upon entering the site.  His access was suspended at 0930.                   |
|                                                                              |
| The NRC Resident Inspector was notified.                                     |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   37144       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: RIVER BEND               REGION:  4  |NOTIFICATION DATE: 07/05/2000|
|    UNIT:  [1] [] []                 STATE:  LA |NOTIFICATION TIME: 13:58[EDT]|
|   RXTYPE: [1] GE-6                             |EVENT DATE:        07/05/2000|
+------------------------------------------------+EVENT TIME:        09:20[CDT]|
| NRC NOTIFIED BY:  FELTNER                      |LAST UPDATE DATE:  07/05/2000|
|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |DAVID GRAVES         R4      |
|10 CFR SECTION:                                 |                             |
|AESF 50.72(b)(2)(ii)     ESF ACTUATION          |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| REACTOR CORE COOLING SYSTEM ISOLATION DURING A SURVEILLANCE                  |
|                                                                              |
| "On 7/5/2000 at 0920 CDT, the Reactor Core Isolation Cooling (RCIC) System   |
| isolated due to a sensed high steam supply line differential pressure.       |
| Instrument technicians were performing required surveillance test            |
| STP-207-4248 on Division 1 pressure transmitter, E51-PDTN084A. This          |
| surveillance requires the transmitter to be hydraulically isolated from the  |
| system in order to perform a calibration and also generates a Division 1     |
| RCIC Isolation signal.                                                       |
|                                                                              |
| Per the plant design, the Division 1 and 2 pressure transmitters share a     |
| common sensing line.  While removing the Division 1 transmitter from         |
| service, the Division 2 transmitter, E51-PDTN084B, spiked high causing a     |
| Division 2 RCIC isolation signal and subsequent closure of E51-MOVF063, RCIC |
| Steam Supply Inboard Isolation Valve.                                        |
|                                                                              |
| Although the RCIC system was inoperable for scheduled maintenance at the     |
| time of the Division 2 isolation, the containment isolation function was     |
| still in service and considered operable. High Pressure Core Spray and all   |
| other ECCS systems remained operable while the RCIC system was isolated.     |
| RCIC will be returned to service following the completion of the scheduled   |
| maintenance activities.                                                      |
|                                                                              |
| The RCIC System Isolation Instrumentation is designated as an Engineered     |
| Safety Features system and this event is therefore reportable in accordance  |
| with 10CFR50.72."                                                            |
|                                                                              |
| The NRC Resident Inspector was notified.                                     |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   37145       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: BEAVER VALLEY            REGION:  1  |NOTIFICATION DATE: 07/05/2000|
|    UNIT:  [1] [] []                 STATE:  PA |NOTIFICATION TIME: 14:17[EDT]|
|   RXTYPE: [1] W-3-LP,[2] W-3-LP                |EVENT DATE:        07/05/2000|
+------------------------------------------------+EVENT TIME:        13:07[EDT]|
| NRC NOTIFIED BY:  MUELLER                      |LAST UPDATE DATE:  07/05/2000|
|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |STEVEN DENNIS        R1      |
|10 CFR SECTION:                                 |                             |
|ARPS 50.72(b)(2)(ii)     RPS ACTUATION          |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     A/R        Y       100      Power Operation  |0        Hot Standby      |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| REACTOR TRIP FROM 100% POWER DUE TO TURBINE TRIP.                            |
|                                                                              |
| The plant had a reactor trip from 100% power due to a turbine trip.  Cause   |
| of the turbine trip is being investigated. All control rods fully inserted   |
| and no relief valves lifted or ECCS actuated.  The plant is stable in mode 3 |
| with RCS temperature and pressure at 547�F and 2235 Psig.  There were no     |
| radiological releases and no RCS or steam generator tube leaks.  All safety  |
| related equipment functioned as required and remains operable.  The aux feed |
| system started as expected and decay heat is being removed via the steam     |
| bypass system to the condenser.                                              |
|                                                                              |
| The NRC Resident Inspector was notified.                                     |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   37146       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: MILLSTONE                REGION:  1  |NOTIFICATION DATE: 07/05/2000|
|    UNIT:  [] [] [3]                 STATE:  CT |NOTIFICATION TIME: 15:16[EDT]|
|   RXTYPE: [1] GE-3,[2] CE,[3] W-4-LP           |EVENT DATE:        07/05/2000|
+------------------------------------------------+EVENT TIME:        15:00[EDT]|
| NRC NOTIFIED BY:  LANGAN                       |LAST UPDATE DATE:  07/05/2000|
|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |STEVEN DENNIS        R1      |
|10 CFR SECTION:                                 |                             |
|HFIT 26.73               FITNESS FOR DUTY       |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|                                                   |                          |
|                                                   |                          |
|3     N          Y       100      Power Operation  |100      Power Operation  |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| CONTRACT EMPLOYEE FAILS FITNESS FOR DUTY TEST                                |
|                                                                              |
| A contractor employee failed a Fitness For Duty test administered on July 5, |
| 2000. Specific details of the event are not for public disclosure.           |
| Appropriate action has been taken accordance with the company Fitness For    |
| Duty program.                                                                |
|                                                                              |
|                                                                              |
| The NRC Resident Inspector will be notified.  State and Local agencies have  |
| been notified.                                                               |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   37147       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: HARRIS                   REGION:  2  |NOTIFICATION DATE: 07/05/2000|
|    UNIT:  [1] [] []                 STATE:  NC |NOTIFICATION TIME: 17:14[EDT]|
|   RXTYPE: [1] W-3-LP                           |EVENT DATE:        07/05/2000|
+------------------------------------------------+EVENT TIME:        10:35[EDT]|
| NRC NOTIFIED BY:  JERNIGAN                     |LAST UPDATE DATE:  07/05/2000|
|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |GEORGE BELISLE       R2      |
|10 CFR SECTION:                                 |                             |
|HFIT 26.73               FITNESS FOR DUTY       |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| USE OF ILLEGAL CONTROLLED SUBSTANCE                                          |
|                                                                              |
| An employee was tested for cause for illegal controlled substance with the   |
| results being negative.  However, he admitted during the interview he had    |
| used such substance.                                                         |
|                                                                              |
| The NRC Resident Inspector was notified.                                     |
+------------------------------------------------------------------------------+
