CLI Number | Licensee | Docket Date/ Number |
---|---|---|
CLI-25-05 | Powertech (USA) Inc. (Dewey-Burdock In Situ Uranium Recovery Facility) | 07/15/2025 40-9075-LR |
CLI-25-04 | Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2) | 07/15/2025 50-275-LR-2 50-323-LR-2 |
CLl-25-03 | Holtec Decommissioning International, LLC; Holtec Palisades, LLC; and Palisades Energy, LLC (Palisades Nuclear Plant) |
04/29/2025 50-255-LT-3 72-007-LT-3 |
CLl-25-02 | Entergy Nuclear Operations, INC., Entergy Nuclear Palisades, LLC, Holtec International, and Holtec Decommissioning International, LLC (Palisades Nuclear Plant and Big Rock Point Site) |
04/08/2025 50-255-LT-2 50-155-LT-2 72-007-LT 72-043-LT-2 |
CLI-25-01 | U.S. Department of Energy (High Level Waste Repository) |
03/06/2025 63-001-HLW |