Draft Final Regulatory Guide DG-1105, "Procedures and Criteria for Assessing Seismic Soil Liquefaction at Nuclear Power Plant Sites"
July 15, 2003
|
MEMORANDUM TO: | William D. Travers Executive Director for Operations |
| | /RA/ |
| |
FROM: | John T. Larkins, Executive Director Advisory Committee on Reactor Safeguards |
| |
SUBJECT: | DRAFT FINAL REGULATORY GUIDE DG-1105, "PROCEDURES AND CRITERIA FOR ASSESSING SEISMIC SOIL LIQUEFACTION AT NUCLEAR POWER PLANT SITES" |
During the 504th meeting of the Advisory Committee on Reactor Safeguards, July 9-11, 2003, the Committee considered the draft final Regulatory Guide DG-1105, "Procedures and Criteria for Assessing Seismic Soil Liquefaction at Nuclear Power Plant Sites," and decided not to review it. The Committee has referred this Regulatory Guide to the Advisory Committee on Nuclear Waste for possible consideration.
Reference:
Memorandum dated July 2, 2003, from Michael E. Mayfield, Director, Division of Engineering Technology, RES, to John T. Larkins, Executive Director, ACRS, Subject: Request for ACRS Review of Draft Final of DG-1105, "Procedures and Criteria for Assessing Seismic Soil Liquefaction at Nuclear Power Plant Sites"
cc: | A. Vietti-Cook, SECY I. Schoenfeld, OEDO A. Thadani, RES M. Mayfield, RES Y. Li, RES J. Garrick, ACNW, w/ref. H. Larson, ACNW, w/ref. |
Page Last Reviewed/Updated Monday, August 15, 2016