The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Performance Indicators

subscribe to page updates

icon/hyperlink for: Performance Indicators page, consisting of a medium-blue circle with light green outline, and in the center is a white image of a speedometer guage with its needle pointing over to the high end of the scale.A quantitative measure of a particular attribute of licensee performance that shows how well a plant is performing when measured against established thresholds.  Licensees submit their data quarterly; the NRC regularly conducts inspections to verify the submittals and then uses its own inspection data plus the licensees' submittals to assess each plants performance.

Plants IE
01
IE
03
IE
04
MS
05
MS
06
MS
07
MS
08
MS
09
MS
10
BI
01
BI
02
EP
01
EP
02
EP
03
EP
04
OR
01
PR
01
PP
01
Legend
R=Red  W=White  GTG=Greater Than Green I=Insufficient Data to Calculate PI  U=Unique Design
Y=Yellow  G=Green  T=Thresholds under development N=Not Applicable  D=Descrepant
 
IE01   = Unplanned Scrams per 7000 Critical Hours MS05 = Safety System Functional Failures
IE03   = Unplanned Power Changes MS07 = High Pressure Injection System
MS06 = Emergency AC Power System MS09 = Residual Heat Removal System
MS10 = Heat Removal System BI01   = Reactor Coolant System Specific Activity
BI02   = Reactor Coolant System Leak EP01  = Drill/Exercise Performance
EP02  = ERD Drill Participation EP04  = Emergency Response Facility and Equipment
OR01 = Occupational Exposure Control Effectiveness PP01  = Protected Area Equipment
IE04   = Unplanned Scrams with Complications PR01  = RETS/ODCM Radiological Effluent
   

Page Last Reviewed/Updated Monday, April 21, 2025