Date Description Status
12/14/2023 Kairos Hermes Test Reactor Construction Permit No. CPTR-6 Issued
12/14/2023 Kairos Hermes Test Reactor Summary Record of Decision Issued
12/12/2023 CLI-23-05, Memorandum and Order directing the staff to issue the Hermes construction permit Issued
09/05/2023 Federal Register Notice: Construction permit application; notice of hearing Published
08/23/2023 Staff's Statement in Support of the Uncontested Hearing for Issuance of a Construction Permit for the Kairos Hermes Test Reactor issued
08/17/2023 Environmental Impact Statement for the Construction Permit for the Kairos Hermes Test Reactor Issued
06/20/2023 Response to ACRS Letter on the Kairos Non-Power Reactor Hermes Construction Permit Application Issued 
06/13/2023 Safety Evaluation Related to the Kairos Power LLC Construction Permit Application for the Hermes Test Reactor Issued
06/09/2023 Summary Report for the Regulatory Audit of Kairos Power LLC Hermes Construction Permit Preliminary Safety Analysis Report Chapters 4 and 13 (Accident Analysis) Issued
06/09/2023 Summary Report for the Regulatory Audit of Kairos Power LLC Hermes Construction Permit Preliminary Safety Analysis Report General Audit Issued
05/31/2023 Hermes Non-Power Reactor Preliminary Safety Analysis Report, Revision 3 Received
05/16/2023 ACRS Letter on Kairos Non-Power Reactor Hermes Construction Permit Application  Issued
04/25/2023 Summary Report for the Regulatory Audit of Kairos Power LLC Hermes Construction Permit Preliminary Safety Analysis Report Instrumentation and Control (Chapter 7) Issued
04/25/2023 Summary Report for the Regulatory Audit of Kairos Power LLC Hermes Construction Permit Preliminary Safety Analysis Report Decay Heat Removal System (Chapter 6, Section 6.3) Issued
04/25/2023 Summary Report for the Regulatory Audit of Kairos Power LLC Hermes Construction Permit Preliminary Safety Analysis Report Site Characteristics (Chapter 2) Issued
04/18/2023 (Approved SE – a preliminary version) Safety Evaluation Related to the Kairos Power LLC Construction Permit Application for the Hermes Test Reactor Available
02/24/2023 Hermes Non-Power Reactor Preliminary Safety Analysis Report, Revision 2 Received
09/29/2022 Hermes Non-Power Reactor Preliminary Safety Analysis Report, Revision 1 Received
09/26/2022 NUREG-2263 Draft Environmental Impact Statement for the Construction Permit for the Kairos Hermes Test Reactor Issued
09/01/2022 Response to NRC Request for Additional Information 350 Received
08/31/2022 Response to NRC Request for Additional Information 348 Received
08/31/2022 Response to NRC Request for Additional Information 339 Received
08/24/2022 Summary Report for Environmental Audit of the Kairos Hermes Test Reactor Construction Permit Application Issued
08/19/2022 Response to NRC Request for Confirmation of Information 349 Received
08/02/2022 Final Request for Additional Information 350 for Air Ingress into the Primary Heat Transport System Issued
08/02/2022 Final Request for Additional Information 348 on Shutdown Rod Reliability Issued
08/02/2022 Final Request for Additional Information 339 Regarding Inspection of Vessel Internals and the Natural Gas Circulation Flow Path Issued
08/02/2022 Final Request for Confirmation of Information 349 on Salt Purity in the Chemistry Control System and the Inert Gas System Issued
08/01/2022 Issuance of Environmental Scoping Summary Report Issued
05/27/2022 Hermes Construction Permit Preliminary Safety Analysis Report Site Characteristics (Chapter 2) Audit Plan Issued
04/08/2022 Plan for an Audit of the Hermes Construction Permit Preliminary Safety Analysis Report Chapter 7 on Instrumentation and Control Issued
02/23/2022 Audit Plan for the Hermes Construction Permit Preliminary Safety Analysis Report Chapters 4, Section 4.5 and 13 Issued
02/17/2022
 
Hermes Construction Permit Preliminary Safety Analysis Report Chapter 6, Section 6.3 Audit Plan Issued
02/15/2022
 
Notice of Intent to Conduct Scoping Process and
Prepare Environmental Impact Statement
Published
02/10/2022
 
Plan for a General Audit of the Hermes Construction Permit Application Issued
02/04/2022
 
Federal Register Notice: Construction permit application; opportunity to request a hearing and petition for leave to intervene; order imposing procedures Published
02/02/2022
 
Hermes Environmental Report Audit Plan Issued
12/15/2021
 
Hermes Test Reactor Construction Permit Application Review Schedule and Resource Estimate Issued
11/29/2021
 
Acceptance for Docketing of the Hermes Non-power Test Reactor Construction Permit Application Acceptance letter
10/31/2021 Kairos Power Construction Permit Application for Hermes Part 2, Environmental Report Accepted for review on 11/29/21
09/29/2021 Kairos Power Construction Permit Application for Hermes Part 1, Preliminary Safety Analysis Report Accepted for review on 11/29/21