Combined License Application for Fermi America President Donald J. Trump Advanced Energy and Intelligence Campus, Units 1-4
subscribe to page updates
On June 17, 2025, Fermi America submitted its application for 10 CFR Part 52 combined licenses (COLs) for four AP1000 advanced passive pressurized-water reactors, Fermi America Units 1 through 4.
For details (including the latest submittal of the application, the related review schedule, and the associated staff documentation), see the following topics on this page:
Application Information
The following table provides access to the COL Application that Fermi America submitted for Fermi America Units 1 through 4.
Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Final Safety Analysis Report and associated Technical/Topical Reports would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.
Part |
Description |
Revision |
1 |
General and Financial Information |
TBD |
2 |
Final Safety Analysis Report (FSAR) |
TBD |
3 |
Environmental Report |
TBD |
4 |
Technical Specifications |
TBD |
5 |
Emergency Plans |
TBD |
6 |
Security Plans |
TBD |
7 |
Departures and Exemption Requests |
TBD |
8 |
Safeguards Information (SGI) and Security-Related Information |
TBD |
9 |
Withheld Proprietary Information |
TBD |
10 |
Inspection, Tests, Analyses and Acceptance Criteria (ITAAC) Closure Process |
TBD |
11 |
Enclosures |
TBD |
Incorporated by Referenced Documents:

Review Schedule
Key Milestones |
Completion Date
Actual - A
Target - T |
Application Tendered |
06/17/2025-A |
Acceptance Review |
Acceptance Review Start |
TBD |
Docketing Decision Letter Issued/Acceptance Review Complete |
TBD |
Review Schedule Established/Schedule Letter Issued to Applicant |
TBD |
Safety Review |
Phase A - Requests for Additional Information (RAIs) and Supplemental RAIs
(Formerly Phase 1 and 2) |
TBD |
Phase B - Advanced Final safety evaluation report (SER) without Open Items
(Formerly Phase 4) |
TBD |
Phase C - ACRS Review of Advanced Final SER
(Formerly Phase 5) |
TBD |
Phase D - Final SER
(Formerly Phase 6) |
TBD |
Environmental Review |
Phase 1 - Scoping |
TBD |
Phase 2 - Draft Environmental Impact Statement (DEIS) |
TBD |
Phase 3 - Response to Public Comments on DEIS completed |
TBD |
Phase 4 - Final Environmental Impact Statement |
TBD |
Hearing |
Mandatory Hearing Complete |
TBD |
License |
Commission decision on issuance of COL application |
TBD |


Current Contacts for the Fermi America, Units 1 through 4 |
Safety Project Manager (s) |
William Gleaves
Allen Fetter |
Environmental Project Manager |
Mary Richmond |
Contact a Public Affairs Officer |