Combined License Application Documents for Aurora – Oklo Power Plant Application

The following table provides access to the COL Application and other documents that Oklo, Power LLC submitted for Aurora – Oklo Nuclear Power Plant.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Description Status
1/06/2022 OKLO INC. - Denial of the Aurora Combined Operating License Application for Failure to Supply Information No further action
1/06/2022 Completeness Determination of Oklo-2021-R19-NP, Revision 3, "Maximum Credible Accident Methodology," and Oklo-2021-R20-NP, Revision 1, "Performance-Based Licensing Methodology" No further action
10/19/21 Oklo Inc., Submittal of Performance-Based Licensing Methodology Rev. 1 Completeness Determination: Submittal of Performance-Based Licensing Methodology Rev. 1  
1/06/2022
10/05/21 Oklo Inc. – Submittal of Maximum Credible Accident Methodology Rev. 3 Completeness Determination: Submittal of Maximum Credible Accident Methodology Rev. 3
1/06/2022
09/02/21 Oklo, Inc. Fee Waiver Response Letter No further action
08/05/21 Oklo Performance-Based Licensing Methodology Topical Report Completeness Determination Oklo Response 10/19/2021
08/05/21 Oklo Maximum Credible Accident Topical Report Completeness Determination Oklo Response 10/05/2021
07/02/21 Oklo, Inc. – Submittal of Maximum Credible Accident Methodology Topical Report and Performance-Based Licensing Methodology Topical Report Completeness Determinations:
Maximum Credible Accident  8/05/2021
Performance-Based Licensing  8/05/2021
06/17/21 Oklo, Inc. – Letter of Intent Fee Waiver Request for Review of Maximum Credible Accident Methodology Topical Report and Performance-Based Licensing Methodology Topical Report Review completed NRC response letter to Oklo 09/02/2021
12/23/20 Oklo Aurora – Step 1 Review Regulatory Applicability Audit Summary (EPID L-2020-NEW-0004) Audit Plan 09/28/20
12/21/20 Oklo Inc. Response Letter to the NRC Letter, Oklo Power LLC Extension of Step 1 Technical Review of Key Safety and Design Aspects of the Aurora Powerhouse, November 17, 2020 Oklo Response to NRC 11/17/20 Step 1 extension letter
12/21/20 Oklo Inc. Response Letter to the NRC Letter, Oklo Step 1 Technical Review of Key Safety and Design Aspect Activities Related to the Applicability of Regulations, November 17, 2020 Oklo Response to NRC 11/17/20  Applicability of Regulations letter
11/17/20 Oklo Power LLC Extension of Step 1 Technical Review of Key Safety and Design Aspects of the Aurora Powerhouse NRC Letter to Oklo extending Step 1 review
11/17/20 Oklo Step 1 Technical Review of Key Safety and Design Aspect Activities Related to the Applicability of Regulations NRC Letter to Oklo on the Applicability of Regulations to the Aurora design
10/30/20 RAI Responses Step 1 Aurora Oklo Oklo RAI response package
10/01/20 Step 1 Structures, Systems, and Components Classification Request for Additional Information Audit Plan Audit Summary not issued to date
09/28/20 Regulatory Applicability Audit Plan – Oklo Aurora Audit Summary 12/23/2020
09/23/20 Request for Additional Information – Aurora Reactor Step 1 – Review Safety Classification of Systems, Structures and Components RAI Responses 10/30/20
09/22/20 Step 1 Maximum Credible Accident Request for Additional Information Audit Plan Audit Summary not issued to date
09/21/20 Request for Additional Information – Aurora Reactor Step 1 – Review, Maximum Credible Accident – Heat Transfer in the Reactor System RAI Responses 10/30/20
09/18/20 Request for Additional Information – Aurora Reactor Step 1 – Review, Maximum Credible Accident RAI Responses 10/30/20
09/18/20 Request for Additional Information – Aurora Reactor Quality Assurance Program RAI Responses 10/30/20
09/18/20 Summary of Audit for the Oklo Power LLC Aurora Reactor Step 1 – Review, Maximum Credible Accident – Heat Transfer in the Reactor System Audit Plan 08/13/20
08/19/20 Summary of Audit for the Oklo Power LLC Aurora Combined License Application Acceptance Review Audit Plan 04/01/20
08/13/20 Audit Plan for the Oklo Power LLC. Aurora Reactor Step 1 – Review, Maximum Credible Accident – Heat Transfer in the Reactor System RAIs 09/21/20
RAI Responses 10/30/20
Audit Summary 09/18/20
06/24/20 Aurora Oklo – FRN Notice of Hearing and Opportunity for leave to Intervene 7/31/20 – 12/22/20 Emergency Petition Beyond Nuclear, et. al. Package includes petition, and responses from NRC staff, Oklo, and NRC Commission
06/05/20 Acceptance Review for the Oklo Aurora Combined License Application Acceptance review letter describes Step 1 and Step 2 review.
04/01/20 Audit Plan for the Oklo Power Aurora Reactor Combined License Application Acceptance Review Audit Summary 08/19/20
03/11/20 Oklo Power Combined Operating License Application for the Aurora at INL Application submittal package
Accepted for Review 06/05/20