Date |
Description |
Status |
1/06/2022 |
OKLO INC. - Denial of the Aurora Combined Operating License Application for Failure to Supply Information |
No further action |
1/06/2022 |
Completeness Determination of Oklo-2021-R19-NP, Revision 3, "Maximum Credible Accident Methodology," and Oklo-2021-R20-NP, Revision 1, "Performance-Based Licensing Methodology" |
No further action |
10/19/21 |
Oklo Inc., Submittal of Performance-Based Licensing Methodology Rev. 1 |
Completeness Determination: Submittal of Performance-Based Licensing Methodology Rev. 1
1/06/2022 |
10/05/21 |
Oklo Inc. – Submittal of Maximum Credible Accident Methodology Rev. 3 |
Completeness Determination: Submittal of Maximum Credible Accident Methodology Rev. 3
1/06/2022 |
09/02/21 |
Oklo, Inc. Fee Waiver Response Letter |
No further action |
08/05/21 |
Oklo Performance-Based Licensing Methodology Topical Report Completeness Determination |
Oklo Response 10/19/2021 |
08/05/21 |
Oklo Maximum Credible Accident Topical Report Completeness Determination |
Oklo Response 10/05/2021 |
07/02/21 |
Oklo, Inc. – Submittal of Maximum Credible Accident Methodology Topical Report and Performance-Based Licensing Methodology Topical Report |
Completeness Determinations:
Maximum Credible Accident 8/05/2021
Performance-Based Licensing 8/05/2021 |
06/17/21 |
Oklo, Inc. – Letter of Intent Fee Waiver Request for Review of Maximum Credible Accident Methodology Topical Report and Performance-Based Licensing Methodology Topical Report |
Review completed NRC response letter to Oklo 09/02/2021 |
12/23/20 |
Oklo Aurora – Step 1 Review Regulatory Applicability Audit Summary (EPID L-2020-NEW-0004) |
Audit Plan 09/28/20 |
12/21/20 |
Oklo Inc. Response Letter to the NRC Letter, Oklo Power LLC Extension of Step 1 Technical Review of Key Safety and Design Aspects of the Aurora Powerhouse, November 17, 2020 |
Oklo Response to NRC 11/17/20 Step 1 extension letter |
12/21/20 |
Oklo Inc. Response Letter to the NRC Letter, Oklo Step 1 Technical Review of Key Safety and Design Aspect Activities Related to the Applicability of Regulations, November 17, 2020 |
Oklo Response to NRC 11/17/20 Applicability of Regulations letter |
11/17/20 |
Oklo Power LLC Extension of Step 1 Technical Review of Key Safety and Design Aspects of the Aurora Powerhouse |
NRC Letter to Oklo extending Step 1 review |
11/17/20 |
Oklo Step 1 Technical Review of Key Safety and Design Aspect Activities Related to the Applicability of Regulations |
NRC Letter to Oklo on the Applicability of Regulations to the Aurora design |
10/30/20 |
RAI Responses Step 1 Aurora Oklo |
Oklo RAI response package |
10/01/20 |
Step 1 Structures, Systems, and Components Classification Request for Additional Information Audit Plan |
Audit Summary not issued to date |
09/28/20 |
Regulatory Applicability Audit Plan – Oklo Aurora |
Audit Summary 12/23/2020 |
09/23/20 |
Request for Additional Information – Aurora Reactor Step 1 – Review Safety Classification of Systems, Structures and Components |
RAI Responses 10/30/20 |
09/22/20 |
Step 1 Maximum Credible Accident Request for Additional Information Audit Plan |
Audit Summary not issued to date |
09/21/20 |
Request for Additional Information – Aurora Reactor Step 1 – Review, Maximum Credible Accident – Heat Transfer in the Reactor System |
RAI Responses 10/30/20 |
09/18/20 |
Request for Additional Information – Aurora Reactor Step 1 – Review, Maximum Credible Accident |
RAI Responses 10/30/20 |
09/18/20 |
Request for Additional Information – Aurora Reactor Quality Assurance Program |
RAI Responses 10/30/20 |
09/18/20 |
Summary of Audit for the Oklo Power LLC Aurora Reactor Step 1 – Review, Maximum Credible Accident – Heat Transfer in the Reactor System |
Audit Plan 08/13/20 |
08/19/20 |
Summary of Audit for the Oklo Power LLC Aurora Combined License Application Acceptance Review |
Audit Plan 04/01/20 |
08/13/20 |
Audit Plan for the Oklo Power LLC. Aurora Reactor Step 1 – Review, Maximum Credible Accident – Heat Transfer in the Reactor System |
RAIs 09/21/20
RAI Responses 10/30/20
Audit Summary 09/18/20 |
06/24/20 |
Aurora Oklo – FRN Notice of Hearing and Opportunity for leave to Intervene |
7/31/20 – 12/22/20 Emergency Petition Beyond Nuclear, et. al. Package includes petition, and responses from NRC staff, Oklo, and NRC Commission |
06/05/20 |
Acceptance Review for the Oklo Aurora Combined License Application |
Acceptance review letter describes Step 1 and Step 2 review. |
04/01/20 |
Audit Plan for the Oklo Power Aurora Reactor Combined License Application Acceptance Review |
Audit Summary 08/19/20 |
03/11/20 |
Oklo Power Combined Operating License Application for the Aurora at INL |
Application submittal package
Accepted for Review 06/05/20 |