Combined License Application Documents for Aurora – Oklo Power Plant Application
The following table provides access to the COL Application and other documents that Oklo, Power LLC submitted for Aurora – Oklo Nuclear Power Plant.
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Date | Description | Status |
|---|---|---|
OKLO INC. - Denial of the Aurora Combined Operating License Application for Failure to Supply Information | No further action | |
Completeness Determination of Oklo-2021-R19-NP, Revision 3, "Maximum Credible Accident Methodology," and Oklo-2021-R20-NP, Revision 1, "Performance-Based Licensing Methodology" | No further action | |
Oklo Inc., Submittal of Performance-Based Licensing Methodology Rev. 1 | Completeness Determination: Submittal of Performance-Based Licensing Methodology Rev. 1 | |
Oklo Inc. – Submittal of Maximum Credible Accident Methodology Rev. 3 | Completeness Determination: Submittal of Maximum Credible Accident Methodology Rev. 3 | |
Oklo, Inc. Fee Waiver Response Letter | No further action | |
Oklo Performance-Based Licensing Methodology Topical Report Completeness Determination | Oklo Response 10/19/2021 | |
Oklo Maximum Credible Accident Topical Report Completeness Determination | Oklo Response 10/05/2021 | |
Oklo, Inc. – Submittal of Maximum Credible Accident Methodology Topical Report and Performance-Based Licensing Methodology Topical Report | Completeness Determinations: | |
Oklo, Inc. – Letter of Intent Fee Waiver Request for Review of Maximum Credible Accident Methodology Topical Report and Performance-Based Licensing Methodology Topical Report | Review completed NRC response letter to Oklo 09/02/2021 | |
Oklo Aurora – Step 1 Review Regulatory Applicability Audit Summary (EPID L-2020-NEW-0004) | Audit Plan 09/28/20 | |
Oklo Inc. Response Letter to the NRC Letter, Oklo Power LLC Extension of Step 1 Technical Review of Key Safety and Design Aspects of the Aurora Powerhouse, November 17, 2020 | Oklo Response to NRC 11/17/20 Step 1 extension letter | |
Oklo Inc. Response Letter to the NRC Letter, Oklo Step 1 Technical Review of Key Safety and Design Aspect Activities Related to the Applicability of Regulations, November 17, 2020 | Oklo Response to NRC 11/17/20 Applicability of Regulations letter | |
Oklo Power LLC Extension of Step 1 Technical Review of Key Safety and Design Aspects of the Aurora Powerhouse | NRC Letter to Oklo extending Step 1 review | |
Oklo Step 1 Technical Review of Key Safety and Design Aspect Activities Related to the Applicability of Regulations | NRC Letter to Oklo on the Applicability of Regulations to the Aurora design | |
RAI Responses Step 1 Aurora Oklo | Oklo RAI response package | |
Step 1 Structures, Systems, and Components Classification Request for Additional Information Audit Plan | Audit Summary not issued to date | |
Regulatory Applicability Audit Plan – Oklo Aurora | Audit Summary 12/23/2020 | |
Request for Additional Information – Aurora Reactor Step 1 – Review Safety Classification of Systems, Structures and Components | RAI Responses 10/30/20 | |
Step 1 Maximum Credible Accident Request for Additional Information Audit Plan | Audit Summary not issued to date | |
Request for Additional Information – Aurora Reactor Step 1 – Review, Maximum Credible Accident – Heat Transfer in the Reactor System | RAI Responses 10/30/20 | |
Request for Additional Information – Aurora Reactor Step 1 – Review, Maximum Credible Accident | RAI Responses 10/30/20 | |
Request for Additional Information – Aurora Reactor Quality Assurance Program | RAI Responses 10/30/20 | |
Summary of Audit for the Oklo Power LLC Aurora Reactor Step 1 – Review, Maximum Credible Accident – Heat Transfer in the Reactor System | Audit Plan 08/13/20 | |
Summary of Audit for the Oklo Power LLC Aurora Combined License Application Acceptance Review | Audit Plan 04/01/20 | |
Audit Plan for the Oklo Power LLC. Aurora Reactor Step 1 – Review, Maximum Credible Accident – Heat Transfer in the Reactor System | ||
Aurora Oklo – FRN Notice of Hearing and Opportunity for leave to Intervene | 7/31/20 – 12/22/20 Emergency Petition Beyond Nuclear, et. al. Package includes petition, and responses from NRC staff, Oklo, and NRC Commission | |
Acceptance Review for the Oklo Aurora Combined License Application | Acceptance review letter describes Step 1 and Step 2 review. | |
Audit Plan for the Oklo Power Aurora Reactor Combined License Application Acceptance Review | Audit Summary 08/19/20 | |
Oklo Power Combined Operating License Application for the Aurora at INL | Application submittal package |