1/06/2022

OKLO INC. - Denial of the Aurora Combined Operating License Application for Failure to Supply Information

No further action

1/06/2022

Completeness Determination of Oklo-2021-R19-NP, Revision 3, "Maximum Credible Accident Methodology," and Oklo-2021-R20-NP, Revision 1, "Performance-Based Licensing Methodology"

No further action

10/19/21

Oklo Inc., Submittal of Performance-Based Licensing Methodology Rev. 1

Completeness Determination: Submittal of Performance-Based Licensing Methodology Rev. 1  
1/06/2022

10/05/21

Oklo Inc. – Submittal of Maximum Credible Accident Methodology Rev. 3

Completeness Determination: Submittal of Maximum Credible Accident Methodology Rev. 3
1/06/2022

09/02/21

Oklo, Inc. Fee Waiver Response Letter

No further action

08/05/21

Oklo Performance-Based Licensing Methodology Topical Report Completeness Determination

Oklo Response 10/19/2021

08/05/21

Oklo Maximum Credible Accident Topical Report Completeness Determination

Oklo Response 10/05/2021

07/02/21

Oklo, Inc. – Submittal of Maximum Credible Accident Methodology Topical Report and Performance-Based Licensing Methodology Topical Report

Completeness Determinations:
Maximum Credible Accident  8/05/2021
Performance-Based Licensing  8/05/2021

06/17/21

Oklo, Inc. – Letter of Intent Fee Waiver Request for Review of Maximum Credible Accident Methodology Topical Report and Performance-Based Licensing Methodology Topical Report

Review completed NRC response letter to Oklo 09/02/2021

12/23/20

Oklo Aurora – Step 1 Review Regulatory Applicability Audit Summary (EPID L-2020-NEW-0004)

Audit Plan 09/28/20

12/21/20

Oklo Inc. Response Letter to the NRC Letter, Oklo Power LLC Extension of Step 1 Technical Review of Key Safety and Design Aspects of the Aurora Powerhouse, November 17, 2020

Oklo Response to NRC 11/17/20 Step 1 extension letter

12/21/20

Oklo Inc. Response Letter to the NRC Letter, Oklo Step 1 Technical Review of Key Safety and Design Aspect Activities Related to the Applicability of Regulations, November 17, 2020

Oklo Response to NRC 11/17/20  Applicability of Regulations letter

11/17/20

Oklo Power LLC Extension of Step 1 Technical Review of Key Safety and Design Aspects of the Aurora Powerhouse

NRC Letter to Oklo extending Step 1 review

11/17/20

Oklo Step 1 Technical Review of Key Safety and Design Aspect Activities Related to the Applicability of Regulations

NRC Letter to Oklo on the Applicability of Regulations to the Aurora design

10/30/20

RAI Responses Step 1 Aurora Oklo

Oklo RAI response package

10/01/20

Step 1 Structures, Systems, and Components Classification Request for Additional Information Audit Plan

Audit Summary not issued to date

09/28/20

Regulatory Applicability Audit Plan – Oklo Aurora

Audit Summary 12/23/2020

09/23/20

Request for Additional Information – Aurora Reactor Step 1 – Review Safety Classification of Systems, Structures and Components

RAI Responses 10/30/20

09/22/20

Step 1 Maximum Credible Accident Request for Additional Information Audit Plan

Audit Summary not issued to date

09/21/20

Request for Additional Information – Aurora Reactor Step 1 – Review, Maximum Credible Accident – Heat Transfer in the Reactor System

RAI Responses 10/30/20

09/18/20

Request for Additional Information – Aurora Reactor Step 1 – Review, Maximum Credible Accident

RAI Responses 10/30/20

09/18/20

Request for Additional Information – Aurora Reactor Quality Assurance Program

RAI Responses 10/30/20

09/18/20

Summary of Audit for the Oklo Power LLC Aurora Reactor Step 1 – Review, Maximum Credible Accident – Heat Transfer in the Reactor System

Audit Plan 08/13/20

08/19/20

Summary of Audit for the Oklo Power LLC Aurora Combined License Application Acceptance Review

Audit Plan 04/01/20

08/13/20

Audit Plan for the Oklo Power LLC. Aurora Reactor Step 1 – Review, Maximum Credible Accident – Heat Transfer in the Reactor System

RAIs 09/21/20
RAI Responses 10/30/20
Audit Summary 09/18/20

06/24/20

Aurora Oklo – FRN Notice of Hearing and Opportunity for leave to Intervene

7/31/20 – 12/22/20 Emergency Petition Beyond Nuclear, et. al. Package includes petition, and responses from NRC staff, Oklo, and NRC Commission

06/05/20

Acceptance Review for the Oklo Aurora Combined License Application

Acceptance review letter describes Step 1 and Step 2 review.

04/01/20

Audit Plan for the Oklo Power Aurora Reactor Combined License Application Acceptance Review

Audit Summary 08/19/20

03/11/20

Oklo Power Combined Operating License Application for the Aurora at INL

Application submittal package
Accepted for Review 06/05/20