Oklo Aurora Powerhouse
Project Overview
The U.S. Nuclear Regulatory Commission (NRC) is currently engaged in pre-application activities interactions for the Oklo Aurora Powerhouse reactor. The proposed Oklo reactors are liquid metal-cooled, metal-fueled fast reactors with a maximum power level of 75 MWe.
For more information, please see the Oklo pre-application docket 99902095.
To subscribe to the Oklo Powerhouse email service, select Oklo from the Advanced Reactors list after entering your email into the GovDelivery system.
Pre-Application Activities
Product | Type | Reference | Status |
---|---|---|---|
Standardized Operational Programs | White Paper | ||
Safety Analysis: Initiating Event Analysis | White Paper | ||
Meeting on Security, Source Term, Principal Design Criteria | Slides | No review requested | |
Source Term Modeling Overview | White Paper | ||
Safety Classification Overview | White Paper | ||
Meeting on Safety Classification, PRA, & Materials | Slides | No review requested | |
Meeting on Safety Classification, Environmental, Cybersecurity, and Fitness-for-duty | Slides | No review requested | |
Emergency Plan | White Paper | ||
Considerations for Including Principal Design Criteria in the Licensing Basis in 10 CFR Part 52 | White Paper | ||
Approach to Seismic Design Categorization and Site Characterization | White Paper | ||
Development of Regulatory Controls: Shutdown Case Study | White Paper | ||
Oklo Inc. Licensing Project Plan Q1 2025 Update | Regulatory Engagement Plan | No review requested | |
Preapplication Readiness Assessment for Phase 1 of a Combined License Application | Readiness Assessment | ||
Product-Based Operator Licensing Framework | Topical Report | ||
Principal Design Criteria for the Aurora Powerhouse | Topical Report | ||
Pre-Phase 2 Combined License Application | Audit |