Kairos

Artist rendering Kairos reactor design with the following components: fueling chute, pebble flow, pebble bed core, pebble insertion channel, defueling chute, pebble extraction machine, cover gas space, pebble insertion, reactor coolant outlet, pebble extraction, reactor coolant inlet, decay heat removal system, reactivity control and shutdown elements, core coolant outlet flow, reactor vessel, downcomer, core barrel, graphite reflector, engineered and bypass flow, and core coolant inlet

Project Overview

The U.S. Nuclear Regulatory Commission (NRC) is currenlty engaged in pre-application activities with Kairos Power starting in November 2018. Kairos Power is an Alameda, CA company designing a fluoride salt-cooled high temperature reactor (FHR) using Triso-coated particle fuel in a pebble bed configuration.

For more information, please see the Kairos pre-application documents (NRC Docket 99902069).

To subscribe to the Kairos Fluoride Salt-Cooled High Temperature Reactor (FHR) email service, select Kairos Power FHR from the Advanced Reactors list after entering your email into the GovDelivery system.

For information related to the NRC staff’s review of Kairos’ Hermes testing facility, please see the Hermes review webpage.

For information related to the NRC staff’s review of Kairos’ Hermes 2 testing facility, please see the Hermes 2 review webpage.

Pre-Application Activities

Product

Type

Reference 

Status

Principal Design Criteria (PDC) for the Kairos Power Fluoride Salt-Cooled, High Temperature Reactor (KP-TR-003)

Topical Report

ML19212A756

Feedback Provided
ML20167A174

Regulatory Analysis for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor (KP-TR-004)

Topical Report

ML22018A161

Feedback Provided
ML22159A356

Reactor Coolant for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor (KP-TR-005)

Topical Report

ML20016A486

Feedback Provided
ML20140A147

Scaling Methodology for the Kairos Power Testing Program (KP-TR-006)

Topical Report

ML19357A252

Feedback Provided
ML21013A430

KP-FHR Risk-Informed Performance-Based Licensing Basis Development (LMP) Methodology (KP-TR-009)

Topical Report

ML20101P623

Feedback Provided
ML20328A229

KP-FHR Fuel Performance Methodology (KP-TR-010)

Topical Report

ML21162A349

Feedback Provided
ML22125A275

Metallic Materials Qualification, Rev. 4 (KP-TR-013)

Topical Report

ML23102A176

Feedback Provided
ML23062A727

Kairos Quality Assurance Program (KP-TR-007)

Topical Report

ML21117A046

Feedback
Provided
ML21350A347

Fuel Qualification Methodology (KP-TR-011)

Topical Report

ML22186A215

Feedback
Provided
ML23048A326

KP-FHR Mechanistic Source Term Methodology (KP-TR-012)

Topical Report

ML22088A228

Feedback Provided
ML22136A291

Graphite Materials Qualification, Rev. 4 (KP-TR-014-NP)

Topical Report

ML23108A314

Feedback Provided
ML23062A732

Instrument Setpoint Methodology for the Kairos Power Fluoride Salt‐Cooled High Temperature Reactor (KP‐TR‐021‐NP)

Topical Report

ML24102A116

Feedback Provided
ML24091A004
 

Safeguards Information (SGI) Protection Plan

SGI Plan Approval Request

ML23118A323

Feedback Provided ML23268A009

KP-FHR Core Design and Analysis Methodology Topical Report (KP-TP-024-NP)

Topical Report

ML24095A255

Feedback Provided ML25206A363

Safety Analysis Methodology for the Kairos Power Fluoride Salt-Cooled High-Temperature Test Reactor (KP-TP-020-NP)

Topical Report

ML24156A162

Under Review

Basic Component Definition for the Hermes Non-Power Test Reactors

White Paper

ML24092A389

Feedback Provided
ML24250A124 

Operator Training and Testing Program for the Non-Power Kairos Power Fluoride Salt-Cooled High-Temperature Reactors

Topical Report

ML25192A231

Under Review

Kairos Power LLC 10 CFR 55 Exemption Requests for Non-Power Kairos Power Fluoride Salt-Cooled, High Temperature Reactors

Exemption

ML25211A317

Under Review

To top of page

Contacts

Contacts for the Kairos Power FHR Pre-Application Review

Lead Project Manager

Cayetano Santos

Contact a Public Affairs Officer