By default, this page lists all upcoming meetings (From date = today). You can search via keywords as well as date ranges for past or upcoming meetings. Click Reset to return the list to all upcoming meetings.
Displaying 1 - 20 of 46
Energy Northwest personnel will discuss initiatives and progress associated with improving human performance at the Columbia Generating Station.
Participation: Category 1
This end-of-cycle meeting is held to discuss the Nuclear Regulatory Commission’s assessment of safety performance at the Columbia Generating Station during calendar year 2013.
Participation: Category 1
The purpose of this public meeting is for Energy Northwest, the licensee, to discuss the details of an upcoming relief request regarding the American Society of Mechanical Engineers Boiler and Pressure Vessel Code classification of the reactor water cleanup system at Columbia…
Participation: Category 1
The purpose of the meeting is to support the ongoing staff review of the seismic hazard reevaluation report (Near-Term Task Force Recommendation 2.1 - Seismic) for Columbia Generating Station.
Participation: Category 1
The purpose of this regulatory conference is to discuss an apparent violation identified at Columbia Generating Station concerning the failure of emergency plan implementing procedures to implement requirements of the Columbia Generating Station Emergency Plan. The apparent…
Participation: Category 1
The U. S. Nuclear Regulatory Commission (NRC) will meet with the public to discuss the NRC’s assessment of safety performance at Columbia Generating Station in 2014, as described in the annual assessment letter dated March 4, 2015. The NRC will respond to questions on specific…
Participation: Category 3
This is a Category 3 meeting. The U.S. Nuclear Regulatory Commission (NRC) will meet with the public to discuss the NRC’s assessment of safety performance at Columbia Generating Station in 2015, as described in the annual assessment letter dated March 2, 2016. The NRC will…
Participation: Category 3
To discuss of the outline and technical details for the future reactor water cleanup system license amendment request for Columbia Generating Station.
Participation: Category 1
To discuss the outline and technical details for the future power uprate license amendment request for Columbia Generating Station.
Participation: Category 1
To discuss the outline and technical details for the future emergency control room chiller system license amendment request for Columbia Generating Station.
Participation: Category 1
Northwest Medical Isotopes (NWMI) is meeting with the NRC staff to discuss its planned submittal of an operating license application for its proposed Mo-99 medical isotopes production facility to be located in Columbia, Missouri.
Participation: Category 1
To discuss of the outline and technical details of the future license amendment request which proposes to change Technical Specifications 3.5.1.A, 3.6.1.5.A, and 3.6.2.3.A and the Residual Heat Removal pump/repair completion time for Columbia Generating Station.
Participation: Category 1
Northwest Medical Isotopes (NWMI) is meeting with the NRC staff to discuss an information request issued by the NRC on September 29, 2016 (ML16236A013). The information requests pertains to NWMI's application for construction of its proposed Mo-99 medical isotopes production…
Participation: Category 1
Discuss the status of the Confirmatory Order (CO) and Area Needing Improvement (ANI) issued to Westinghouse Electric Company Columbia Fuel Fabrication Facility (CFFF).
Participation: Category 1
To carry out the NRC's responsibilities under the U.S. Court of Appeals for the District of Columbia Circuit's decision in the case In re Aiken County, 645 F.3d 428 (D.C. Cir. 2011), and the Commission's July 31, 2017, direction in the Staff Requirements Memorandum…
Participation: Category 2
Provide an overview of the NRC licensing and oversight program for the Westinghouse Columbia Fuel Fabrication Facility. Also, the NRC staff will describe the license renewal process, the environmental review, and recent leaks at the facility. The public will have multiple…
Participation: Category 3
The purpose of this meeting, between Energy Northwest and the U.S. Nuclear Regulatory Commission (NRC) staff, is to discuss the outline and technical details for the future emergency control room chiller system license amendment request for Columbia Generating Station
Participation: Category 1
The purpose of this meeting between Energy Northwest and the U.S. Nuclear Regulatory
Commission (NRC) staff is to discuss the outline and technical details for the future
emergency control room chiller system license amendment request (LAR) for Columbia
…
Participation: Category 1
The purpose of this meeting, between Energy Northwest and the U.S. Nuclear Regulatory Commission (NRC) staff, is to discuss the outline and technical details for a future license amendment request for Columbia Generating Station Regarding License Condition 2.C.(11), "Shield…
Participation: Category 1
To conduct a public meeting for the U.S. Nuclear Regulatory Commission’s (NRC) Environmental Assessment (EA) for Westinghouse Electric Company, LLC’s license renewal application to continue operation at its Columbia Fuel Fabrication Facility for an additional 40 years in Richland…
Participation: Category 3