By default, this page lists all upcoming meetings (From date = today). You can search via keywords as well as date ranges for past or upcoming meetings. Click Reset to return the list to all upcoming meetings.
Displaying 61 - 80 of 226
Metallurgy & Reactor Fuels Subcommittee Meeting - Draft NUREG-2195, "Consequential Steam Generator Tube Rupture Analysis for Westinghouse and Combustion Engineering Plants with Thermally Treated Alloy 600 and 690 Steam Generator Tubes.
Participation: Open
Time Change
The NRC staff and Westinghouse will discuss staff questions related to the AP1000 Specialized Seismic Option Report. The questions (see ML16357A071) relate more specifically to Westinghouse's response to RAI-SSO-009 (see ADAMS Nos. ML16334A018 and ML16334A019). A closed…
Participation: Category 1
Meeting Canceled
The NRC staff and Westinghouse will discuss staff questions related to the AP1000
Specialized Seismic Option Report. The questions (see ML16357A071) relate more
specifically to Westinghouse's response to RAI-SSO-009 (see ADAMS Nos.
ML16334A021 and…
Participation: Category 1
The purpose of this meeting is to discuss changes to the Westinghouse Electric Company, LLC (WEC) Topical Report WCAP-17938, "AP1000 In-Containment Cables and Non-Metallic Insulation Debris Integrated Assessment," resulting from a WEC evaluation of hot function testing…
Participation: Category 1
To discuss a proposed Traveler to revise the (TS) Safety Limit (SL) value and method of calculation for the Minimum Critical Power Ratio (MCPR), SL 2.1.1.2, for Boiling Water Reactor (BWR) plants using General Electric or Westinghouse fuel. There is no meeting agenda because the…
Participation: Category 2
Discuss the results of the NRC review of WESTINGHOUSE ELECTRIC COMPANY performance in conducting NRC licensed activities.
Participation: Category 1
To discuss Exelon Lead Test Assembly Program for Byron Unit 2 of the Westinghouse EncoreTM Accident Tolerant Fuel Product.
Participation: Category 2
Meeting Canceled
To discuss with Westinghouse Electric Company (WEC) issues associated with the safety review of topical report "AP1000 In-Containment Cables and Non-Metallic Insulation Debris Integrated Assessment," Revision 2 (ADAMS Accession No. ML17163A299)
Participation: Category 1
Discuss the status of the Confirmatory Order (CO) and Area Needing Improvement (ANI) issued to Westinghouse Electric Company Columbia Fuel Fabrication Facility (CFFF).
Participation: Category 1
The purpose of this ACRS AP 1000 Subcommittee meeting is to review Westinghouse topical report, WCAP-17938-P, Rev. 2, "AP 1000 In-Containment Cables and Non-Metallic Insulation Debris Integrated Assessment."
Participation: Category 3
The purpose of this meeting is for Florida Power & Light Company staff to discuss with the U.S. Nuclear Regulatory Commission staff its planned license amendment request to revise the Turkey Point Technical Specifications Safety Limit 2.1.1.b to reflect the peak centerline…
Participation: Category 1
Discuss the results of the NRC review of Westinghouse Electric Company’s performance in conducting NRC licensed activities as described in the annual Licensee Performance Review letter dated March 2, 2017 (ML18064A119).
Participation: Category 1
The purpose of this workshop is to bring together NRC staff, regulated utilities, vendors of nuclear components, and other interested stakeholders to discuss vendor oversight issues. Vendor inspection support topics at this workshop will include counterfeit, fraudulent, and…
Participation: Category 3
To discussion with FPL the potential subsequent license renewal wear issues of CRDM thermal sleeves at Turkey Point based on recent operating experience Part 21 Notification by Westinghouse (ML18143B678 and ML18198A275), and NRC Information Notice 2018-10 (ML18214A710)
Participation: Category 1
The purpose of this meeting is to discuss PWROG comments to the Draft Safety Evaluation for Topical Report PWROG-16043-P, Revision 2, “PWROG Program to Address NRC Information Notice 2012-09: “Irradiation Effects on Fuel Assembly Spacer Grid Crush Strength” for Westinghouse and…
Participation: Closed
The purpose of this meeting, between Wolf Creek Nuclear Operating Corporation (WCNOC) and the U.S. Nuclear Regulatory Commission (NRC) staff, is to discuss the request for additional information (RAI) dated October 4, 2018 (Agencywide Documents Access and Management System…
Participation: Category 1
Time Change
To discuss proprietary information related to the review of WCAP-17794-P "Westinghouse D5 correlation" topical report
Participation: Closed
Provide an overview of the NRC licensing and oversight program for the Westinghouse Columbia Fuel Fabrication Facility. Also, the NRC staff will describe the license renewal process, the environmental review, and recent leaks at the facility. The public will have multiple…
Participation: Category 3
The U.S. Nuclear Regulatory Commission (NRC) and Indian Michigan Power Company (I&M or licensee) staff will discuss a proposed license amendment related to Title 10 of the Code of Federal Regulations, Part 50, Appendix A, General Design Criterion 4, dynamic response…
Participation: Category 1
To discuss information in reference to Westinghouse EnCore Accident Tolerant Fuel Technology and closed meeting held on 01/17/2019. Information that will be discussed during the closed portion of the meeting was identified as proprietary by the NRC staff.
Participation: Partially Closed