Meeting Details
ObservationDate
April 1, 2026
Time
10:00 am–11:00 am EDT
Location
NRC One White Flint North
11555 Rockville Pike, O-5B4
Rockville, MD
Agenda
Meeting Info
Purpose
The purpose of this meeting between Pacific Gas and Electric Company (PG&E, the licensee) and the U.S. Nuclear Regulatory Commission (NRC) staff, is to provide information regarding a proposed removal of Limiting Condition for Operation 3.0.4b from the Actions Note in Technical Specification (TS) 3.5.3, "ECCS [emergency core cooling systems] - Shutdown"; TS 3.7.5, "Auxiliary Feedwater (AFW) System"; and TS 3.8.1, "AC [alternating current] Sources - Operating," for Diablo Canyon Nuclear Power Plant, Units 1 and 2, using the Risk-Informed Process for Evaluation (RIPE). Publicly available presentation slides for this meeting can be found in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML26077A278.
Teleconference / Webinar
Bridge Number: 3015762978
Passcode: 101942356#
Docket
05000275
-
Diablo Canyon 1
05000323
-
Diablo Canyon 2
Documents
| Document Title | Description |
|---|---|
| ML26077A278 | Diablo Canyon RIPE April 1 Presubmittal Meeting Slides (EPID L-2026-LRM-0025) |
| ML26078A024 | 04/01/2026 Presubmittal Meeting with Pacific Gas and Electric Company Regarding Limiting Condition for Operation 3.0.4b from Technical Specifications 3.5.3, 3.7.5, and 3.8.1 for Diablo Canyon Nuclear Power Plant, Units 1 and 2 (EPID L-2026-LRM-0025) |
Participants
Office of Nuclear Reactor Regulation
External Participants
Pacific Gas and Electric
Contact
Samson Lee
(301) 415-3168