Meeting Details
Information with Q&ADate
May 21, 2025
Time
9:00 am–12:00 pm CDT
Location
Teleconference, Hybrid, NRC Region IV Office
1600 East Lamar Boulevard, Conference Room 2
Arlington, TX
Agenda
Meeting Info
Purpose
Discuss the significance of a preliminary finding with low-to-moderate safety significance (White) and an associated apparent violation of NRC requirements for procedures affecting Emergency Diesel Generator A governor linkage to fuel rack failure on October 9, 2024. This discussion is part of the process the NRC uses before making a final determination. The finding and apparent violation are discussed in NRC Inspection Report 05000382/2025090, dated April 9, 2025 (NRC’s Agencywide Documents Access and Management System [ADAMS] Accession No. ML25097A205).
Teleconference / Webinar
Bridge Number: 3015762978
Conference ID: 542542620#
Docket
05000382
-
Waterford 3
Documents
| Document Title | Description |
|---|---|
| ML25097A205 | Waterford Steam Electric Station, Unit 3 - NRC Inspection Report 05000382/2025090 And Preliminary White Finding |
| ML25132A033 | 05/21/2025 Pre-Decisional Regulatory Conference with Entergy Operations, Inc., Waterford Steam Electric Station, Unit 3 |
Participants
Region IV
External Participants
John Giddens
John Monninger
John Dixon
Entergy Operations, Inc
Alfred Sanchez
Barry Davis
Cale Young
John Twarog
Joseph Sullivan
Kerry Gaston
Nicholas Taylor
Geoffrey Miller
Stephenie Pyle
Beth Alferink
Contact
Alfred Sanchez
(817) 200-1525
John Dixon
(817) 200-1574