Skip to main content

The purpose of this presubmittal meeting, between Entergy Operations, Inc. (Entergy, the licensee) and the U.S. Nuclear Regulatory Commission (NRC) staff, is to discuss the proposed license amendment request to revise applicable Technical Specifications b

Meeting Details

Observation
Date
January 17, 2024
Time
1:00 pm–2:00 pm EST
Location
Webinar

Agenda
Meeting Info

Purpose

The purpose of this presubmittal meeting, between Entergy Operations, Inc. (Entergy, the licensee) and the U.S. Nuclear Regulatory Commission (NRC) staff, is to discuss the proposed license amendment request to revise applicable Technical Specifications by making use of Analysis and Measurement Services Corporation (AMS) online monitoring (OLM) methodology as the technical basis to switch from time-based surveillance frequency for channel calibrations to a condition-based calibration frequency based on OLM results for Arkansas Nuclear One, Units 1 and 2; Grand Gulf Nuclear Station, Unit 1; River Bend Station, Unit 1; and Waterford Steam Electric Station, Unit 3 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23348A357). The proposed change is based on the NRC-approved topical report AMS-TR-0720R2-A, “Online Monitoring Technology to Extend Calibration Intervals of Nuclear Plant Pressure Transmitters” (ML21235A493).

Teleconference

Bridge Number: 3015762978
Passcode: 31633656#
Conference ID: N/A

Docket

05000313 - Arkansas Nuclear 1
05000368 - Arkansas Nuclear 2
05000382 - Waterford 3
05000416 - Grand Gulf 1
05000458 - River Bend 1

Documents

Document Title Description
ML23348A357 Arkansas Nuclear One, Units 1 and 2, River Bend, Unit 1, Grand Gulf, Unit 1, Waterford, Unit 3, Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting
ML23348A357 Arkansas Nuclear One, Units 1 and 2, River Bend, Unit 1, Grand Gulf, Unit 1, Waterford, Unit 3, Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting
ML23348A357 Arkansas Nuclear One, Units 1 and 2, River Bend, Unit 1, Grand Gulf, Unit 1, Waterford, Unit 3, Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting
ML24011A081 01/17/2024 Presubmittal Meeting with Entergy Operations, Inc. for a Proposed Online Monitoring License Amendment Request (EPID L-2023-LRM-0110)

Participants

Office of Nuclear Reactor Regulation

External Participants

Entergy Operations Inc
T. Wengert
P. Couture
C. Peabody
C. Mahan
D. Williams
J. Ashcraft
T. Sweat

Contact

Thomas J. Wengert

(301) 415-4037

Siva P. Lingam

(301) 415-1564

Page Last Reviewed/Updated Thursday, January 11, 2024