Meeting Details
ObservationPurpose
The purpose of the pre-submittal meeting is to hear SNC's plan to submit a proposed LAR for Vogtle, Units 1 and 2, related to the allowable values based on updated instrument uncertainty calculations for the Reactor Trip System and Engineered Safety Features Actuation System trip functions in Technical Specification (TS) 3.3.1 and TS 3.3.2, respectively.
Teleconference
Bridge Number: 3015762978
Passcode: 805118577
Docket
05000424
-
Vogtle 1
05000425
-
Vogtle 2
Documents
| Document Title | Description |
|---|---|
| ML21204A005 | 08/13/2021 Pre-Submittal Meeting between U.S. Nuclear Regulatory Commission (NRC) and Southern Nuclear Operating Company (SNC) related to a Proposed License Amendment Request (LAR) for Vogtle Electric Generating Plant (Vogtle), Units 1 and 2 |
Participants
Office of Nuclear Reactor Regulation
External Participants
Southern Nuclear Operating Company
Ken Lowery
Contact
John G. Lamb
(301) 415-3100