Meeting Details
ObservationPurpose
The purpose of this meeting, between Entergy Operations, Inc. (Entergy) and the U.S. Nuclear Regulatory Commission (NRC) staff, is to discuss Entergy's pre-submittal for a relief request for Grand Gulf Nuclear Station, Unit 1 (Grand Gulf). In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a(z)(1), Entergy plans to propose an alternative to the requirements of the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants, Subsection ISTC-3522, "Category C Check Valves," and subparagraph ISTC-3630(a) under Subsection ISTC-3630, "Leakage Rate for Other Than Containment Isolation Valves," for 22 pressure isolation valves (PIVs) at Grand Gulf. The proposed alternative will request NRC approval to implement PIV testing at Grand Gulf on a performance-based frequency, consistent with the containment isolation valve testing process under 10 CFR Part 50, Appendix J, Option B.
Teleconference
Bridge Number: 13015762978
Passcode: 95958526
Docket
05000416
-
Grand Gulf 1
Documents
| Document Title | Description |
|---|---|
| ML21126A303 | Entergy Operations, Inc. Pre-Submittal Meeting - Grand Gulf Nuclear Station, Unit 1 Relief Request to Adopt Performance-based Testing for Pressure Isolation Valves (PIVs) |
| ML21112A188 | 05/10/2021 Notice of Meeting with Entergy Operations, Inc. |
Participants
Office of Nuclear Reactor Regulation
External Participants
Entergy Operations Inc
J. Dixon-Herrity
S. Lingam
M. Farnan
J. Schrage
P. Couture
A. Bufford
E. Kennedy
L. Cook
P. Kalka
R. Meister
Contact
Siva P. Lingam
(301) 415-1564