Meeting Details
Category 2Date
May 31, 2018
Time
1:00 pm–2:30 pm EDT
Location
NRC One White Flint North
11555 Rockville Pike, O9-B4
Rockville, MD
Agenda
Meeting Info
Purpose
To discuss a potential license amendment request concerning the revision of interim power level steps in the event of a degraded feedwater flow line Leading Edge Flowmeter (LEFM) operational status. Discussion will include the technical, operational, and regulatory strategy Exelon Generation Company, LLC is intending to pursue to support adding additional power level steps to the LEFM actions in the Technical Requirements Manual.
Teleconference
Bridge Number: 8886599574
Passcode: 33560
Docket
05000277
-
Peach Bottom 2
05000278
-
Peach Bottom 3
Documents
| Document Title | Description |
|---|---|
| ML18138A241 | 05/31/2018 Peach Bottom Atomic Power Station, Units 2 and 3, Pre-Submittal Meeting for License Amendment Request related to Leading Edge Flowmeter Operational Status |
| ML18144A693 | Peach Bottom Atomic Power Station, Units 2 and 3 - License Amendment Request for Expanded Actions for LEFM Flow Meter Conditions - NRC Pre-Submittal Meeting May 31, 2018. |
Contact
Jenny Tobin
(301) 415-2328