Skip to main content

This is a public meeting between the U.S. Nuclear Regulatory Commission (NRC) and Entergy Operations, Inc., to present the results of the NRC’s annual assessment of safety performance at the Grand Gulf Nuclear Station (GGNS), during the calendar year 20

Meeting Details

Category 1
Date
March 20, 2018
Time
5:30 pm–7:00 pm EDT
Location
Hampton Inn & Suites Vicksburg

3330 Clay St.
Vicksburg, MS

Agenda
Meeting Info

Purpose

This is a public meeting between the U.S. Nuclear Regulatory Commission (NRC) and Entergy Operations, Inc., to present the results of the NRC’s annual assessment of safety performance at the Grand Gulf Nuclear Station (GGNS), during the calendar year 2017. For reference, the NRC’s annual assessment letter may be accessed via Agencywide Documents Access and Management System (ADAMS) Accession No. ML18057B123 at http://www.nrc.gov/reading-rm/adams.html.

Docket

05000416 - Grand Gulf 1

Documents

Document Title Description
ML18057B123 Annual Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2017006).
ML18064A361 03/20/2018 Public Meeting with Entergy Operations, Inc. (Grand Gulf Nuclear Station)

Participants

Region IV

External Participants

Entergy Operations Inc
- Ayesha Athar, Acting Resident Inspector, Grand Gulf
- Bob Franssen, GGNS, General Manager, Plant Operations
- Cale Young, Senior Project Engineer, DRP
- Eric Larson, GGNS Site Vice President
- Gregory Hawkins , GGNS, Regulatory Director
- Jason Kozal, Branch Chief, DRP
- Neil Day, Acting Senior Resident Inspector, Grand Gulf
- Ryan Lantz, Deputy Director, DRP

Contact

Jason Kozal

(817) 200-1144

Page Last Reviewed/Updated Monday, March 05, 2018