Meeting Details
Category 2Time Change
Date
February 26, 2015
Time
9:00 am–3:00 pm EST
Location
NRC Three White Flint North
11601 Landsdown Street, Room 3WFN-6A28
Rockville, MD
Agenda
Meeting Info
Purpose
The purpose of this meeting is for the Levy Nuclear Plant Units 1 and 2 applicant to present details of the methodology and proprietary calculations related to three AP1000 design matters addressed in RAI Letter Nos. 121 and 122: the estimated dose to main control room operators, heatup of the main control room, and the hydrogen vent location Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) No. 3 in the AP1000 Design Control Document, Revision 19, Tier 1 Table 2.3.9-3 (See Agencywide Documents Access and Management System Accession Nos. ML14259A096, ML14259A106, ML14259A100, and ML14283A522). Other technical topics related to the Levy Nuclear Plant Units 1 and 2 combined license application may be addressed as appropriate.
Docket
05200025
-
Vogtle Unit 3
05200026
-
Vogtle Unit 4
05200027
-
V. C. Summer Unit 2
05200028
-
V. C. Summer Unit 3
05200029
-
Levy County Nuclear Plant 1
05200030
-
Levy County Nuclear Plant 2
05200040
-
Turkey Point Unit 6
05200041
-
Turkey Point Unit 7
05200018
-
Duke Lee 1
05200019
-
Duke Lee 2
Documents
| Document Title | Description |
|---|---|
| ML15056A091 | 02/26/2015 NOTICE OF FORTHCOMING PUBLIC MEETING TO DISCUSS AP1000 DESIGN MATTERS FOR THE LEVY NUCLEAR PLANT UNITS 1 AND 2 COMBINED LICENSE APPLICATION: ESTIMATED DOSE TO MAIN CONTROL ROOM (MCR) OPERATORS, MRC HEATUP, AND HYDROGEN VENT LOCATION ITAAC |
Comments
Members of the public who wish to call-in via a toll-free teleconference line are encouraged to telephone or e-mail the contact(s) listed above to make such arrangements before the teleconference. Certain portions of this meeting will be closed to the public if the staff determines that the information is proprietary in nature.
Participants
Office of New Reactors
External Participants
Duke Energy
Contact
Habib, Donald
(301) 415-1035