Meeting Details
ObservationTime Change
Purpose
The purpose of this meeting is to discuss a program that will provide a basis for extending the liquid penetrate testing (PT) examination frequency for embedded flaw repairs (EFR) performed on reactor vessel head penetrations discussed in WCAP-15897-NP-A, Rev. 2. "The NRC Safety Evaluation for WCAP-15897-NP-A, Rev. 2 requires a PT examination of an EFR every refueling outage.”
Teleconference / Webinar
Bridge Number: 3015762978
Conference ID: 79722252#
Documents
| Document Title | Description |
|---|---|
| ML24247A091 | PWROG-NRC Meeting to Discuss a Supplement to WCAP-15987-P/NP-A Rev. 2 for Reduction in PT Exam Frequency |
| ML24206A004 | 08/08/2024 Virtual Public Meeting between the US Nuclear Regulatory Commission and the Pressurized Water Reactor Owners Group to Discuss Liquid Penetrate Testing Examination Frequency |
| ML031840237 | 07/03/2003, Westinghouse (Vendor) Acceptance for Referencing - Topical Report WCAP-15987-P, Revision 2, "Technical Basis for the Embedded Flaw Process for Repair of Reactor Vessel Head Penetrations." TAC No. MB8997 |
Participants
Office of Nuclear Reactor Regulation
External Participants
Pressurized Water Reactor Owners Group
David Rudland
James Andrachek
Contact
Leslie Fields
(301) 415-1186