Skip to main content

The purpose of this partially closed meeting between Entergy Operations, Inc. (Entergy) and the U.S. Nuclear Regulatory Commission (NRC) staff is to discuss, in detail, a planned license amendment request (LAR) to replace the Core Protection Calculator an

Meeting Details

Category 1
Date
January 16, 2020
Time
8:00 am–3:00 pm EST
Location
NRC Two White Flint North

11545 Rockville Pike, HQ-TWFN-2D30
Rockville, MD

Agenda
Meeting Info

Purpose

The purpose of this partially closed meeting between Entergy Operations, Inc. (Entergy) and the U.S. Nuclear Regulatory Commission (NRC) staff is to discuss, in detail, a planned license amendment request (LAR) to replace the Core Protection Calculator and Control Element Assembly Calculator Systems with digital systems in accordance with Digital Instrumentation and Control (DI&C) Interim Staff Guidance (ISG) DI&C-ISG-06, Revision 2. This is the third presubmittal meeting for this planned LAR.

Teleconference

Bridge Number: 8889350213
Passcode: 35138

Docket

05000382 - Waterford 3

Documents

Document Title Description
ML19365A097 01/16/2020 Third Partially Closed Presubmittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification at Waterford Steam Electric Station, Unit 3 (EPID L-2019-LRM-0093)
ML20008F008 Waterford Steam Electric Station, Unit 3, Transmittal of Slides for Third Partially Closed Presubmittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification.

Comments

Portions of the meeting will include discussion of proprietary topics and will be closed to the public. In the non-proprietary portions of the meeting, members of the public will have one or more opportunities to communicate with the NRC staff after the public business portion of the meeting.

The schedule for the non-public portion of this meeting is tentative.

Participants

Office of Nuclear Reactor Regulation

External Participants

Entergy Operations Inc
Westinghouse
J. Dixon-Herrity
M. Waters
A. Pulvirenti
J. Johnston
P. Wood
A. Harris
R. Gaston
W. Odess-Gillett

Contact

April L. Pulvirenti

(301) 415-1390

Page Last Reviewed/Updated Friday, January 10, 2020