Reactor Correspondence

The following is a list of correspondence on the Spent Fuel Pool Leak. For additional information see Spent Fuel Pools.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Description
10/19/09 Indian Point Nuclear Generating Units 1, 2 and 3 - NRC Inspection Report on the status of the Long-Term Groundwater Monitoring Program
12/16/08 ROP Deviation Memo for inspection resources at Indian Point
05/15/08 Entergy's letter discussing long-range plans for groundwater monitoring.
05/13/08 Press Release I-08-032; NRC to Discuss Inspection of Company's Assessment of Groundwater Contamination at Indian Point Plant on May 20th.
05/13/08 Indian Point Nuclear Generating Units 1 and 2 - NRC Inspection Report Nos. 05000003/2007010 and 05000247/2007010.
12/19/07 Approved renewal of deviation from the Reactor Oversight Process to continue heightened NRC oversight of specific issues at the Indian Point Energy Center
12/11/06 Memorandum to Luis A. Reyes, Executive Director of Operations, from Samuel Collins, Regional Administrator Region I, requesting renewal of the deviation from Reactor Oversight Process to continue increased NRC oversight of specific issues at Indian Point Energy Center associated with Entergy's groundwater contamination inspection effort; and activities related to the reliability, availability, and testing of the new Indian Point Energy Center Alert Notification System. The Executive Director of Operations approved the request on 12/21/06.
11/13/06 Indian Point Nuclear Generating Unit 2 - NRC Inspection Report No. 05000247/2006004
11/07/06 Indian Point Nuclear Generating Unit 3 - NRC Inspection Report No. 05000286/2006004
08/11/06 Indian Point Nuclear Generating Unit 2 - NRC Inspection Report No. 05000247/2006003
08/03/06 Oak Ridge Institute of Science and Education (ORISE) reports of analytical results of various samples collected by NRC relative to ground water contamination at Indian Point
07/24/06 Indian Point Nuclear Generating Unit 3 - NRC Inspection Report No. 05000286/2006003
04/20/06 Potential Sources of Groundwater Contamination at Indian Point
04/10/06 Current Status/Future Plans Regarding Onsite Groundwater Contamination at IPEC
03/16/06 Indian Point Nuclear Generating Unit 2 - NRC Special Inspection Report No. 05000247/2005011
02/13/06 Revised Monitoring Well MW-111 Tritium 30 Day Special Report
11/03/05 Monitoring Well MW-111 Tritium 30 Day Special Report
10/28/05 Memorandum to Luis A. Reyes, Executive Director of Operations, from Samuel Collins, Regional Administrator Region I, requesting deviation from Reactor Oversight Process to increase NRC oversight of specific issues at Indian Point Energy Center. Specific issues identified are: Unit 2 Spent Fuel Pool Leakage and On-Site Tritium Contamination; and Reliability and Availability of the Alert Notification System, i.e., Sirens. The request was approved on 10/31/2005. The following Press Release pertains: NRC Announces Enhanced Oversight of Indian Point
10/07/05 Updated Special Inspection Charter - Indian Point No. 2
09/20/05 Letter from James W. Tuffey regarding Indian Point Spent Fuel Pool
09/20/05 Special Inspection Charter-Indian Point Unit No. 2
09/20/05 Press Release I-05-049; NRC Performing Special Inspection at Indian Point 2 Nuclear Plant; Small Amount of Leakage from Spent Fuel Pool Under Review

To top of page

Page Last Reviewed/Updated Wednesday, January 05, 2022