Skip to main content

Final Safety Evaluations

Final Safety Evaluations for William States Lee III Nuclear Station, Units 1 and 2 Application

The following table provides access to Final Safety Evaluations that the NRC has issued in connection with its review of the COL application that Duke Energy submitted for William States Lee III Nuclear Station, Units 1 & 2.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

ChapterDescriptionDate
1Introduction and Interfaces08/01/16
2Site Characteristics08/01/16
3Design of Structures, Components, Equipment, and Systems08/01/16
4Reactor08/01/16
5Reactor Coolant System and Connected Systems08/01/16
6Engineered Safety Features08/01/16
7Instrumentation and Controls08/01/16
8Electric Power08/01/16
9Auxiliary Systems08/01/16
10Steam and Power Conversion08/01/16
11Radioactive Waste Management08/01/16
12Radiation Protection08/01/16
13Conduct of Operations08/01/16
14Initial Test Program08/01/16
15Accident Analysis08/01/16
16Technical Specifications08/01/16
17Quality Assurance08/01/16
18Human Factors Engineering08/01/16
19Response to Severe Accident Policy Statement08/01/16
19ALoss of Large Areas of the Plant Due to Explosions or Fires08/01/16
20Requirements Resulting from Fukushima Near Term Task Force Recommendations08/01/16
21Design Changes Proposed In Accordance With ISG-1108/01/16
22Conclusions08/01/16

Page Last Reviewed/Updated Thursday, September 03, 2026