Advanced Safety Evaluations for William States Lee III Nuclear Station, Units 1 and 2 Application

The following table provides access to Advanced Safety Evaluations that the NRC has issued in connection with its review of the COL application that Duke Energy submitted for William States Lee III Nuclear Station, Units 1 & 2.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

ChapterDescriptionDate
1Introduction and InterfacesTBD
2Site CharacteristicsTBD
3Design of Structures, Components, Equipment, and SystemsTBD
4Reactor01/04/12
5Reactor Coolant System and Connected SystemsTBD
6Engineered Safety FeaturesTBD
7Instrumentation and Controls10/11/11
8Electric PowerTBD
9Auxiliary Systems01/17/12
10Steam and Power ConversionTBD
11Radioactive Waste ManagementTBD
12Radiation ProtectionTBD
13Conduct of OperationsTBD
14Initial Test Program11/01/11
15Accident Analysis11/18/11
16Technical Specifications07/19/11
17Quality Assurance10/19/11
18Human Factors EngineeringTBD
19Response to Severe Accident Policy StatementTBD