The following table provides access to Final Safety Evaluations that the NRC has issued in connection with its review of the COL application that STPNOC submitted for South Texas Project, Units 3 & 4.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

ChapterDescriptionDate
 Table of Contents09/29/15
 List of Abbreviations09/29/15
 Abstract of the Final Safety Evaluation Report09/29/15
1Introduction and General Description of Plant09/29/15
2Site Characteristics09/29/15
3Design of Structures, Components, Equipment, and Systems09/29/15
4Reactor09/29/15
5Reactor Coolant System and Connected Systems09/29/15
6Engineered Safety Features09/29/15
7Instrumentation and Controls Systems09/29/15
8Electric Power09/29/15
9Auxiliary Systems09/29/15
10Steam and Power Conversion System09/29/15
11Radioactive Waste Management09/29/15
12Radiation Protection09/29/15
13Conduct of Operations09/29/15
14Initial Test Program09/29/15
15Accident and Analysis09/29/15
16Technical Specifications09/29/15
17Quality Assurance09/29/15
18Human Factors Engineering09/29/15
19Response to Severe Accident Policy Statement09/29/15
20Not Used 
21Not Used 
22Requirements Resulting From Fukushima Near-Term Task Force Recommendations09/29/15
App APost Combined License - Activities - License Conditions, Inspections, Test, Analyses and Acceptance Criteria, and Final Safety Analysis Report Commitments09/29/15
App BChronology of Combined License Application09/29/15
App CElectronic Request for Additional Information09/29/15
App DReferences09/29/15
App EPrincipal Contributors09/29/15
App FReport by Advisory Committee on Reactor Safeguards09/29/15